Laserfiche WebLink
<br /> <br />PERIODIC INSPECTION FORM <br />Water, Sediment, or Slurry Impoundments <br />INSPECTOR'S NAME: Ron Gehrke <br />NPDES I.D. NO.: CO-00002 1 D.P. 006 <br />FACILITY CONFIGURATION: Cross-Va le Pond <br />SITE NAME: Pond #00 <br />MINE NAME: Seneca Mine II-W Peabody Coa Co <br />MINE I.D. NO.: CMLRD Permit No. C-82-057 <br />DATE: 11/21/91 <br />DATE LAST INSPECTION: <br />LOCATION: NW~,NW;, Sec.2 5N,R88W <br />LOCATION: 8 mi. 5 of Hayden, C <br />OWNER'S REP.: Scott Williams. Supt. <br />Circle or write in appropriate response <br />1. Foundation preparation (removal of vegetation, stumps, topsoil): _ Yes No N/A <br />2. Lift thickness: 12 in. N/A <br />3. Compaction according to approved plan: Yes No NJA <br />4. Burning (specify extent and location): Yes No N/A <br />5. Angle of slope: 3:1 upstream, 3:1 downstream Total = 6:1 N/A <br />6. *Seepage (specify location, color, and approximate volume) <br />From underdrain pipes: Yes N/ <br />At isolated points on embankment slopes: Yes o A <br />At natural hillside: Yes ~o N/A <br />Over widespread areas: Yes o N/A <br />From downstream foundation area: Yes N/A <br />"Boils" beneath stream or ponded water: Yes o N/A <br />7. Cracks or scarps on crest: Yes NO N/A <br />8. Cracks or scarps on slope: Yes N N/A <br />9. Sloughing or bulging on slope: Yes No N/A <br />10. *Major erosion problems: Yes No NJA <br />11. Surface movements in valley bottom or on hillside: Yes No N/A <br />12. *Erosion of toe: Yes No N/A <br />13. *Water impounded against toe: Yes No N/A <br />14. Existing embankment freeboard: 15.6 feet <br />15. Increase X Decrease in water level: t_0 feet <br />16. Cracks, bulging, or erosion on upstream face: Yes No N/A <br />17. Visible sumps or sinkholes in slurry surface: Yes No NJA <br />18. *Clogging <br />Spillway channels and pipes: Yes No <br />Decant system: Yes Lo P <br />Diversion ditches: Yes No A <br />19. *Cracking or crushing of pipes <br />Spillway pipes: Yes No <br />Decant system: Yes o /A <br />20. Trash racks clear and in place: Yes No N/A <br />*Maior adverse changes in these items could cause instability and should be reported to the <br />Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions <br />noted in these items should normally be described (extent, location, volume, etc.) in the <br />space on the back of this sheet. <br />