My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52167
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:03 PM
Creation date
11/20/2007 3:14:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980136
IBM Index Class Name
Permit File
Doc Date
6/30/1980
Doc Name
LIMITED IMPACT AND SPECIAL TEN DAY PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TYPE OR PRINT CLEARLY <br />14. Present-land use <br />a ra.culture <br />(i.e., agricultural. industrial, etc.) 4 <br />15. Proposed future land use agriculture <br />(Coal of reclamation) <br />INSTAUCTIDNS: This application form must be submitted in duplicate and each form must <br />be accompanied by the following information and items. The application <br />will not be processed until complete. See RULE 3 (for Limited Impact) <br />or RULE 4 (for Special 10-day) for additional guidance. <br />EXHIBIT A - Legal Description <br />The legal description must identify the affected land and be wholly adequate for <br />field location of the property. It can be in the form of metes and bounds survey <br />or a description by reference to township, range, and section to at least the <br />nearest quarter quarter section.' Where applicable, the street address or lot <br />~umber(s):may.be used. <br />EXHIBIT B - Mining Plan <br />This can be a general discussion of the methods, equipment, phases or stages of <br />the operation and those portions of land affected by each. The plan should be <br />closely correlated with the map and should show where extraction will begin, which <br />direction it will proceed. , <br />EXHIBIT C - Map <br />This map should be as comprehensive as possible in terms of clearly defining <br />the permit baimdaries and indicating all roads or stoc]cpile areas to be used is <br />connet:tion with the operation. All ?manediarely. adjacent.].aridowners must be shown.. <br />T7re closest gvarter.secSjon carner~.sertinm'7.ine, tQ'aay oLhei latatPable.p¢»int ' <br />shvnld also be. shown on the map.. <br />EXHIBIT D - Wildlife Water Resources, Vegetation and Soils Information' _- -,~ <br />Each of the above-mentioned subjects must be addressed as outlined in the. ~- <br />applicable Rule, under item number ten (10), <br />EXHIBIT E - Reclamation Plan <br />As with the mining plan, this should be a general discussion of the methods, <br />equipment, phases or stages of the reclamation process and those portions of <br />land-affected by each. If possille; the 'plan should be 'closely correlated <br />with the map. If not; the narrative must be comprehensive enough to draw an <br />accurate verbal picture of the expected-physical appearance of [he area after <br />completion of reclamation. <br />E703IBIT F _ Proof of .Local Government Approval <br />This. must be a letter from the local government specifying conformance with <br />existing zoning regulations. <br />EXHIBIT G - Source of Legal Right to Enter <br />This could be a copy of the lease, deed, abstract of title, or current tax <br />receipt. In lieu thereof, a statement acknowledged by a notary public that <br />the operator has the legal right to enter and mine will be accepted. <br />**FOR SPECIAL 10-DAY PEPJdITS ONLY** <br />E?O~IIBIT B - Reclamation Casts <br />If the surety is requested to be less than $2500, the operator must submit <br />facts to support such request. Otherwise a surety of $2500 will automatically <br />be set. <br />E.~OiIBIT I - Ter•.os of Governmental Contract <br />The operator must submit a copy of the contract or other proof that proves the <br />necessity of a special 10-day permit. The operator must also submit evidence <br />of the surety provided under the governmental contract, if it was required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.