Laserfiche WebLink
Michelle L. Hatcher <br />8/13/2007 <br />16. The decision of the State Engineer shall have no preceder <br />force, shall not create any presumptions, shift the burden t <br />a defense in any water court case or any other legal actior <br />initiated concerning the substitute water supply plan. This <br />bind the State Engineer to act in a similar manner in any o' <br />involving other plans or in any proposed renewal of this ply <br />imply concurrence with any findings of fact or conclusions <br />herein, or with the engineering methodologies used by the <br />Should you have any further comments or questions, please <br />Assistant Division Engineer in Greeley at 970-352-8712 or Joanna ~ <br />Sincerely, <br />fJ!/liYix~ <br />Kevin G. Rein, P.E. <br />Chief of Water Supply <br />Attachments: Table 1 (amended), Table 2, Table 3 (amended), <br />cc: Scott Cuthbertson, Assistant Division Engineer <br />Robert Stahl, Water Commissioner District 2 <br />Colorado Division of Reclamation Mining and Safety <br />KG~ww:Lagarge West Inc. 2007 SWSP.doc <br />Page6 <br />iial or evidentiary <br />f proof, or serve as <br />that may be <br />iecision shall not <br />per applications <br />~, and shall not <br />If law contained <br />Scott Cuthbertson, <br />of this office. <br />Protocol, Lease <br />