Laserfiche WebLink
• <br />TABLE A (continued) <br />MONITORING SITES & FREQUENCY <br />SURFACE FLOW MARCH-MAY <br />REGULAR SAMPLING <br />CONTINGENT SAMPLING <br />(sample only when pumping site 109 or <br />115 is discharging, between 24 hours <br />after the discharge begins and 36 hours <br />after it ends( <br />WATER WATER LAB SULFATE <br />SITE WATER LEVEL & FIELD PARAMETERS QUALITY (see LEVEL & & LAB EC <br />note, below) FIELD EC <br />• <br />• <br />Foidel Creek <br />USGS 09243800 Schedule A Once in March <br />8 Schedule A Once in March <br />14 Schedule A Once in March <br />USGS 09243900 Schedule A Once in March <br />Fish Creek <br />16A Schedule A Once in March Weekly <br />302 <br />27A Schedule A Once in March <br />1003 Schedule A Once in March Weekly Monthly <br />SW-13 Quarterly -Flow only, fields semi-annually semi-annually <br />SW-14 Quarterly -Flow only, fields semi-annually semi-annually <br />SW-15 Quarterly -Flow only, felds semi-annually semi-annually <br />307 Monthly -Flow only, fields semi-annually <br />305 Monthly -Flow only, fields semi-annually <br />Trout Creek <br />301 Monthly Once in March Weekly Monthly <br />69 Monthly Once in March Weekly Monthly <br />1005 Monthly Once in March Weekly Monthly <br />Middle Creek <br />29 Schedule A Once in March Weekly Monthly <br />Schedule A <br />March -Monthly <br />April -Two times during month <br />May -Monthly <br />PR 03-06 <br />Exhibit 147 <br />Note: If site is frozen, <br />March quality sample may <br />be taken in April. <br />03/17/04 <br />