Laserfiche WebLink
~ ~ Inc. • <br />i Engineering and Analytical Services <br />1475 Pme Grove Roatl <br />P0. Box 774018 <br />Steamboat Springs. Colorado BD477 <br />303-8796260 <br />~slber 1, 1988 <br />.',ick P•lills <br />_--onmental Coordinator <br />__ Valley Coal Corporation <br />.3 Routt County Road 27 <br />reek, Colorado 80467 <br />_ Final Inspection of Drainages <br />~- Rick: <br />:ctober 31, 1988 ACZ INC, completed inspection of the recently <br />rutted drainageways. As you know, we inspected the drainageways <br />-~g their construction for gradient, channel dimensions, material <br />_ment, and other relevant design parameters. You are already in <br />-=pt of the ongoing inspection reports covering ten (10) inspection <br />beginning on duly 15 and ending on September 30. The result of <br />construction activities and the inspection work is that the <br />_ swing drainages have been completed. <br />Drainage No. <br />Drainage No. <br />Drainage No. <br />Drainage No. <br />Drainage No. <br />Drainage No. <br />7-lA <br />31-1 <br />31-2 <br />41 <br />51 West <br />51 <br />=-eby certify that these drainages have been constructed according <br />.he design drawings and specifications prepared by Water <br />- Bering Technology. <br />:~ have any questions or require further clarification, please do <br />=-=sitate to contact me. <br />--Aly, <br />_ _YC. '//~ ~ I /y//~_ <br />H. Parrish <br />ado P.E. n17932 <br />.-~o <br />- :eff McKenzie/CYCC <br />H. <br />_,~,:~' 11932 ~_ <br />~~; <br />;off '~. <br />//~~~~Srli niFin nun ~;` <br />i h R T2~ <br />I <br />~~ 4Q <br />l ~~~~~ ~ <br />v~ <br />i <br />~`+ ~`,V <br />\`9c' O~ <br />S>.~ ~_ .~ v2: <br />