Laserfiche WebLink
Paperwork Reduction Act Notice <br />Public reporting burden for this collection of inror-mation is estimated to vary from a range of 10 hours as m <br />average per response for some minor facilities, to 1 ]0 hours a~ m average per response for some major facilities, <br />with a weighted average for major and minor fa~~ilities of 18 hours per response, including time for reviewing <br />instructions, searching existing data sources, gathering and maintaining [he data aeeded, and completing and <br />reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of <br />this collection of information, including suggestions for reducing this burden, to Chief, lnformation Policy <br />Branch, PM-223, U.S. Eovironnteatal Protection Agency, 401 M Street, SW Washington, DC 20460; and to the <br />Office of Information and Regulatory Affairs, Office of hfanagement and Budget, Washington, DC 20503. <br />General Instructions <br />1. If form has been partially completed by preprinting, disregard instructions directed at entry of that information <br />already preprinted. <br />2. Enter 'Permittee .Nome%blmling Address (and facility nameJlocation, if different)," "Permit Number," and <br />"Discharge ,Number" where indicated. (A separate form is required for each discharge) <br />3. Enter dales beginning and ending ";Monitoring Period" cocerzd by form where indicated. <br />4. Enter each "Parmneter" as spceified in monitoring requirements of permit. <br />5. Enter "Sample .4leosureruent" data for each pa,'amcter under "Quantity" and "Quality" in writs spceificxi m permit. <br />"Average" is normally anthmetic average (geo.~tetric average for bacterial parameters) of all sample measurements <br />for each parameter obtained during 'Stloniturir,g Penud", ".llaxunurn" and "Alimnrurn" are normally extreme high <br />and low measurements obtained during ".1looimring Period." (Note [o municipals with secondary lret~tn~ent <br />rcquiremenr Enter i0-day aventge of sample measurements under "Average," and unto naeimum 7~ny a•,eragc <br />of sample measurements obtained during monitoring period under ",t loximum. <br />6. Enter "Pennrt Requirement" for each parameter under "Quantity" and "Quality" a:, specified in pcrnil. <br />7. Under ",No Er" enter number of sample measumunts during monitoring peric•d that exceed maximum (and/or <br />minimum or 7-day average as appropriate) pcrnit requirement for nch pammeter. if none, enter "0". <br />8. Enter "Frequency ojAnnlvsis" both as ".Sample .4leasurmenr" (actual frequency of sampling and analysis used <br />during'monitoring period) and as "Fermi! RenviremenP' specified in perm[. (e.g., Enter "Cont." for continuous <br />monitoring, "/!7" for one day per week, "1'30" for one day per month, "J/9D" for one day per quarter, etc.) <br />9. Enter "!Sample Type" both as "Sample ,Llensuremenl" (actual sample typ,: used during monitoring period) anc as <br />"Permiq Requirement," (e.g., Enter "Grab" (or individual sample, "2JHC" far 24-hour composite, "IJ/.q" for <br />continuous monitoring, etc.) <br />10. Where Niolauons of permit requirements are reported, attach a brief explanation to describe cause and corecuve <br />actions oaken, and reference each violation by date. <br />11. If "no discharge" occurs during monitoring period, enter "No Discharge" across torn in place of data entry. <br />12. Enter "~ame/1'ille ojPrincipal Executive Officer" with "Signature ojPrincipnl Executive OjTcer ojAulhorized <br />Agent,"I "Telephone Number," and "Dare" al boi tom of fore. <br />13. Mail signed Report to Office(s) by date(s) specil fed in perntit. Retain copy for your records. <br />14. More detailed instructions for use of this Discharge hloniroring Report (D.MR) fore may be obtained from Office(s) <br />specified in permit. <br />Legal Notice <br />'This report is'irequired by law (33 U.S.C. 1318; 40 (:. F. R. 125.27). Failure to report or failure to report truthfully can <br />result in civil penalties not to exceed $10,000 per day of violation; or in criminal penalties not to exceed (25,000 per day <br />of violation, or by rmpnsontnent for not more than one year, or by both. <br />EPA Farm 3320-1 (Itev. 08-95) <br />