Laserfiche WebLink
Paperwork Reduction Act Notiice <br />Public reporting burden for this collection of informatioo is estimated to vary from a range of 10 hours as an <br />average per response for some minor facilities, to 1 ]0 hours as an average per response for some major facilities, <br />with a weighted average for major and minor facilities of IS hours per response, including time for reviewing <br />instructions, searching existing data sources, gathering and maintaining the data needed, and completing and <br />reviewing [he collection of information. Send comments regazding the burden estimate or any other aspect of <br />[his collection of iaforma[ioo, including suggestions for reducing this burden, to Chief, information Policy <br />Branch, PM-223, U.S. Environmental Protection Agency, 401 M Street, SW Weshiogtoa, DC 204b0; and to the <br />Office of Information and Regulatory Affairs, Office of Management and Budget, Washington, DC 20503. <br />General Instructions <br />1. If form has been partially completed by preprinting, disregard instructions directed at entry of that information <br />already preprinted. <br />2. Eater "Permittee .Nome~]vlailing Address (and facility nameJlocalion, if different)," "Permit Number," and <br />"Discharge ,Number" where indicated. (A scpamte form is required for each discharge.) <br />3. Enter dates begimting and ending ;4onitoring Period" covered by form where indicated. <br />4. Enter each "Parameter" as specified in monitoeng requirements of permit. <br />S. Enter "Sample ,ifeo.ruremeru" data for each pa-ame[zr under "Quantity" and "Quah(v" in writs specified iu penni[. <br />"Average" is normally arithmetic average (geometric avcmgc for bacterial parameters) of all sample measurements <br />for each parameter obtained during " 1lnnitnrirg Period"; ':1laxinnun" and ".4linunwn" are norm lly extreme high <br />and low mcasure.snts obtained during ".Ltontroring Penud." (Nate to municipals with secondary tre:,~,ment <br />requirefnent Enter 30-day average of sarnplc measurements under "Average," and enter maximum 7~ay average <br />of sample measurements obtatned during monitoring period under 'Stlaxin,um. <br />6. Enter "Pernnt Requirement' for each parameter under "Quantity" and "Quality" as specified in penni[. <br />7. Under !'.No Ex" enter number of sample measurments during monitoring period that exceed maximum (and/or <br />minimum or 7~ay average as appropriate) permit requirement for each paramder !t none, enter "0". <br />8. Enter "'Frequency oj,4nalysis" both as "Semple learunnent" (actual frequency of sampling and analysis used <br />during monitoring period) and as "Fermi; Renuiremenr" specified in permit. (e. g., Enter "Conn," Cor continuous <br />monitoring, "li7" for one day per week, "l X30" for one day per month, "1i90" for one day per quarter, etc.) <br />9. Enter "Sample Tvpe" both as "Sample ,lfeasurernent" (actual sample type used during monitoring period) and as <br />"Permit Requirement," (e.g., Enter "Grab" for individual sample, "24fIC" for 23-hour composite, "1J/A" for <br />continuous monitoring, etc.) <br />10. Where violations of permit requirements are reported, attach a brief explanation to describe cause and corrective <br />actions taken, and inference each violation by date. <br />11. If "no discharge" occurs during monitoring period, enter "No Discharge" across Corm in place of data entry. <br />12. Enter "NameiTi(le ojPrincipal Executive Officer" with "Signature ojPrincipal Executive Officer ojAvthorized <br />Agent,""'Telephone Number," and "Dote" at bol[om oCCorm. <br />13. Mail si~rted Report to Office(s) by date(s) specified in pemtit. Retain copy for your records. <br />14. More detailed instructions for use of this Disch~rrge Monitoring Report (D.'t-1R) form may be obtained from OBice(s) <br />specified in permit. <br />Legal Notice <br />This report is (required by law (33 U.S.C. 1318; 40 C.F.R. 125.27). Failure to report or failure to report truthfully can <br />result N civil ~ettslties not to exceed 510,000 per day of violation; or in criminal penalties not to exceed $25,000 per day <br />of violation, o by imprisonment for not more than one year, or by both. <br />EPA Form 33~ 0-1 (Rev. 08-95) <br />