My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52095
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52095
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:00 PM
Creation date
11/20/2007 3:12:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005A
IBM Index Class Name
Permit File
Doc Date
9/12/2006
Doc Name
As-Built Report Sediment Pond 004
Section_Exhibit Name
Tab 07 Appendix 7-6c.1
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br />Sediment Pond 009 was originally constructed in 1982. The pond is located <br />in the SW/4, Section 12, Township 5 North, Range 87 West (see Exhibit 13- <br />2A, Postmining Topography and Permanent Features) in the Cow Camp Creek <br />drainage, which is tributary to Fish Creek. The contributing watershed is <br />approximately 576 acres, of which 522 acres were disturbed by mining <br />activities, and which have since been reclaimed and revegetated. <br />Pond 004 was constructed as an earthen fill embankment pond (see Exhibit 7- <br />12, Pond #009). The original principal spillway consisted of a 36-inch <br />straight CMP pipe, with a 6-inch opening, During the April 2005 inspection <br />following snow and ice melt, Seneca Coal Company (SCC) representatives <br />determined that the 6-inch discharge barrel was deteriorated such that the <br />existing principal spillway warranted replacement. SCC submitted a <br />technical revision (TR-39) which presented the design and replacement plan <br />for a new principal spillway in June 2005. <br />The replacement principal spillway construction was initiated and completed <br />during August 2005. The replacement principal spillway is an 8-inch <br />diameter straight plastic corrugated pipe set at an invert elevation of <br />6,998.2 feet, A screened cage is fitted to the inflow end to collect trash <br />and debris. <br />The redesign did not affect or include the pond embankment configuration or <br />the existing emergency spillway. The pond embankment has a top width of <br />approximately 15 feet, with upstream and downstream slopes of approximately <br />3H:1V, respectively. The existing emergency spillway is a trapezoidal open <br />channel with a bottom width of 12-feet and 9H:1V side slopes, The crest is <br />a vegetated channel, while the outslope channel has a riprap lining with a <br />Dso of 6-inches. <br />1986 Design Analysis <br />Pond 009 was originally designed to meet or exceed the design and <br />performance requirements of CDMG antl adhere to the following <br />specifications: <br />TR-37 1 Revised 01/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.