Laserfiche WebLink
Dennis Conn <br />March 31, 1989 <br />Page Three <br />1 <br />conveyor belt systems). Therefore, we would expect minimal or no <br />oversize material to be delivered to the waste pile which might <br />interfere with compaction operations. Given the anticipated character <br />of the waste rock and it's placement within Phase III, we would <br />anticipate no detrimental impacts to stability and feel that no <br />additional analysis or modifications to pile design will be necessary <br />to accommodate the materials. <br />I hope this has provided you with the information you required. Should <br />you have any questions, please feel free to call me at our office. <br />Sincerely, <br />GEOWES - COLARA O,,SPR~INGS, INC. <br />,~ E. <br />KLM/lp <br />• <br />