Laserfiche WebLink
• <br />r 1 <br />L_J <br />TABLE 3.4.A.19 <br />FILLAR SIZE AND FACTOR OF SAFETY-AREA-III- <br />LONGWALL MINING <br />April 1989 <br /> <br />Pillar <br />Analyzed Pillar <br />Width x Length <br />(ft x ft) Factor <br />of <br />Safety Recommended <br />Pillar <br />Width x Length <br />(ft x ft) <br />B SEAM '-- ----- -- <br />Mains 80 x 110 1.3 80 x 120 <br />Barrier 7.50 x 700 1.9 250 x 120 <br />Gate 40 x 100 .80 45 x 100 <br />Bleeder 120 x 120 1.2 1.1` 120 x 120 <br />Starting <br />room barrier <br />140 <br />x <br />700 <br />1.1+ <br />140 <br />x <br />700 <br />~- <br />E SEAM - - ----- <br />Mains 60 x 120 1.4 80 x 17.0 <br />Barrier 7.00 x 700 1.9 370 x 700 <br />Gate 30 x 100 ~.85 40 x 100 <br />Bleeder 90 x 100 1.5-.9+ 90 x 100 <br />Starting <br />room barrier <br />110 <br />x <br />700 <br />N/A-1.0+ <br />240 <br />x <br />700 <br /> <br />r------~--- <br />F SRAM <br />----- <br />- <br />------- <br />-- -- _- <br />Mains ~ 60 x 120 1.5 80 x 120 <br />Barrier 200 x 700 1.9 410 x 700 <br />Gate 30 x 100 .9 35 x 100 <br />Bleeder 90 x 100 1.5-.9+ 90 x 100 <br />Starting <br />room barrier <br />110 <br />x <br />700 <br />N/A-1.0 <br />410 <br />x <br />700 <br />+ = Lagging cave <br />• <br />