Laserfiche WebLink
Pepe-y <br />PEABODY COAL COMPANr <br />wiiliT D~Y~i~011 <br />July 10, 1989 <br />Mr. Carl Mount <br />Mined Land Reclamation Division <br />1313 Sherman Street <br />Denver, CO 80203 <br />III IIIIIIIIIIIIIIII <br />1300 South Yele <br />FlapataH, Arizona 86001 <br />)fi02) 774-5253 <br />R~c~o~~~ <br />JUG 1~ 1989 <br />~EC~~AT Ok JI~SI~~ <br />RE: Quarterly Sedimentation Pond Inspections - Seneca II <br />Mine <br />Dear Mr. Mount: <br />Enclosed are the second quarter inspections for Ponds 002, <br />003, 004, and ODS at the Seneca II Mine. As you will <br />note, a joint in the culvert spillway at Pond 004 has been <br />leaking and will be repaired this summer when weather <br />conditions improve and water level decreases. All other <br />conditions appeared stable and acceptable. <br />If you have any questions, please call me. <br />Respectfully, <br />I~ <br />Ronald J. GehrKe~ <br />Senior Engineer <br />kjs <br />Enclosures <br />c: Fred Fest <br />Dennis Jones <br />Jim Ohlman <br />