Laserfiche WebLink
Table of Contents (continued) <br />List of Tables <br />Table 1 Geotechnical Parameters for Limit-Equilibrium and FLAC Analyses <br />Table 2 Change in Piezometer Levels During Spring of 1998 to Predict Future Changes <br />List of Figures <br />Characterization of Landslide <br />Figure 1 Plan of Landslide Corrective Measures <br />Figure 2 Cross Section of Landslide <br />Figure 3 Historic Cumulative Movement of Selected Monitoring Points <br />Corrective Measures <br />Figure 4 Cross Section of Existing Landslide with Corrective Measures <br />Figure 5 Time Line of Corrective Measures <br />Analyses of Corrective Measures <br />Figure 6 Graph of Factor of Safety with Pins and Dewatering <br />Figure 7 Predicted Deformation of Pins after Installation <br />• Summary of Selected Monitoring Information <br />Figure 8 Historic Cumulative Movement on Log-Log Scale for Predicting Future Movement <br />Figure 9 Groundwater Contours Before Correction (December 1997 by HLA) <br />Figure l0A Historic Inclinometer Movement of Selected Inclinometers <br />Figure lOB Historic Inclinometer Movement of Selected Inclinometers <br />Figure lOC Historic Inclinometer Movement of Selected Inclinometers <br />Figure lOD Historic Inclinometer Movement of Selected Inclinometers <br />Figure 11A Movement of Inclinometer I-1C-3 Installed in Pins <br />Figure 11B Movement of Inclinometer I-1C-23 Installed in Pins <br />Figure 12 Groundwater Contours After Correction (April 1998 by HLA) <br />Discussion of Stability for Exfsting Conditions <br />Refer to Figure 6 <br />Discussion of Stability for Long-Term Conditions (Post-Reclamation) <br />Figure 13 Post Mining Cross Section <br />Figure 14 Movement in April, 1998 <br />Figure 15 Movement in April, 1997 <br />f• 1 <br />u <br />0626024\58991-LABM 11 <br />