Laserfiche WebLink
• 4) Control practice factor (OP) = 1,30 - Calculation <br />of ~P is based on worst anticipated condition. <br />CP = CS • CR • CO <br />~g = Control factor due to surface stabilization <br />~R = Control factor due to runoff reduction practices <br />~p = Control factor due to other practices. <br />(Assume unity for factors ~R and gyp), <br />OS = 1,30 (Fr om Table 5.4 - Typical OS Factor <br />Values reported, page 202) <br />(assume compacted fill by bulldozer <br />CP = (1,30 (1,0)(1,0) = 1,30 <br />5) Sediment delivery ratio (OR) <br />DR = DA DV nC <br />• <br />DA = Area effect on delivery ratio <br />T,~V = Vegetative trapping effects <br />DC = Effects of channelization <br />a> DA = 0,70 <br />(From Fig 5.23. Sediment-Delivery ratio versus <br />size of drainage area, ?lA, pg 223) <br />b) DR = 1,0 <br />c) DC = 0.60 <br />(From Fig 5.24 effect if relief-length ratio on <br />delivery ratio, TIC. PG 22~-) <br />R = 35 = 0,39 ~ Dc = 0,60 <br />L ~ <br />0 <br />• o o DR =(0,70)(1,0)((0,60) = 0,42 <br />Assume 420 of sediment produced is delivered <br /> <br />