My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52028
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:57 PM
Creation date
11/20/2007 3:10:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
Appendix M(i) to M(viiI)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Assumptions: <br />1) Time of Concentration = 6 min. 0.1 hrs. <br />2) Time of Travel = 0 <br />3) Drainage Acres (Ad) = 2.5 acre = 0.0039 mi.2 <br />Solution: From Table 5 - 3 - Tabular discharges for <br />Type - II storm distribution (csm/in) <br />Q = 4p (Ad) (Q) <br />Q = hydrograph coordinate discharge in <br />cfs (cubic feet per second) <br />Qp = 99/csm/in w/Tt = 0 <br />10 yr - 24 hr. Peak discharge. <br />Q10 - qp Ad 910 <br />• 910 - (991 csm/in)(0.0039 mi.2)(0.58 in) = 2.24 cfs <br />25 yr - 24 hr. Peak discharge <br />925 - qp Ad 925 <br />925 = (991 csm/in.)(0.0039 mi.~)(0.87 tn)= 3.36 cfs <br />Use the peak discharges for design of inlet ditch and emergency <br />spillway. <br />Reservoir Liquid Volume: <br />Sedimentation Reservoir shall contain the total volume from a 10 <br />year - 24 hr. precipitation event. <br />Detention time for the runoff shall depend upon its' water quality. <br />Once the water quality meets or exceeds the standards as set forth <br />in the mine permit, the reservoir shall be dewatered by pumping. <br />• Volume Surface Runoff, Vsr - 910 x AT <br />12 in/ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.