Laserfiche WebLink
TABLE 19 SURFACE FACILITIES LIST <br />E <br />Pump House to Water Tanks ast Portal (Mao 111 <br />Loadout Belt Building* <br />Walkway Tunnel Thickener Pump House* <br />Warehouse #2 Thickener Substation' <br />Warehouse #3 Pad Acid Tank* <br />Coal Lab Fuel Tank Containment Sumps (2)' <br />Ambulance Garage Antifreeze Tank Sump* <br />East Portal Fan Stacking Tubes (2)* <br />Oil House Water Pump House Tank <br />Industrial Building Scale <br />Hoist House Raw Coal Stockpile Areas #1, 2, 3, & 4 <br />Transfer Building Clean Coal Stockpile <br />Breaker Building Topsoil Stockpile Areas <br />Water Tanks (2) Non-Coal Storage Areas <br />Transfer Conveyor Belt Development Coal Waste Pile <br />Sewage Treatment Tank Refuse Disposal Area* <br />East Portal Substation 8io Remediation Storage Site* <br />River Crossing Bridges (3) SpargeA/ES Remediation System* <br />Prep Plant* Refuse Disposal Slurry L-ines* <br />Thickener* Rail Car and Refuse Belt De-icer' <br />Raw Coal Reclaim Tunnel* Slope Structure <br />Clean Coal Reclaim Tunnel Truck Dump <br />Raw Coal Conveyor* Roads <br />Coal Storage Silos f2) Ponds w/Embankments and Outlet Works" <br />Clean Coal Reclaim Conveyor Ditches and Culverts* <br />Clean Coal Conveyor from Plant' Power Line to Plant Substation" <br />Refuse Conveyor Belt* Power Line to RDA Substation* <br />Silo Loadout Belt" Power line to Loadout Substation" <br />Transfer to Loadout Belt* Rail Unloading Hopper with Conveyor" (MR 84) <br />Loadout Substation* Rail Unloading Transfer Conveyors (2)' (MR 84) <br />Refuse Substation* Raw Coal Stacking Tubes (1)' (MR 84) <br />Plant Substation* Rail Unloading Substation* (MR 84) <br />Electrical House <br />Raw Coal Truck Dump Conveyor* <br />Clean Coal Truck Dump Conveyor w/Belt Feeder* <br />Hoist House <br />Warehouse#1 w/Walkway Tunnel <br />Garage/Oil House <br />Pump House <br />Powder House <br />West Portal (M~o 12) <br />Cap House <br />Core House <br />Fan Shaft <br />Non-Coal Disposal Area* <br />'Post-Law Facilities Constructed Afler August 3, 1977. <br />Revised 01/03/03 <br />2.05-7 <br />MR-85 <br />