My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52001
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:56 PM
Creation date
11/20/2007 3:09:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/2/2006
Section_Exhibit Name
Exhibit 60B Subsidence Evaluation for the South of Divide Mining Area
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEFINITION OF TERMS <br />South of Divide Mining Area.; The mining area encompasses the E Seam longwall panels <br />located primarily in Sections 32, 33, and 34 of Township 13 South, Range 90 West of the 6's <br />Principal Meridian, and Sections 3, 4, and 5 of Township 14 South, Range 90 West of the 6'~ <br />Principal Meridiaa The panels are identified as El through E9_ <br />South of Divide Permit Revision Area.' The pemtit revision area is the regulatory boundary <br />being added to the mine permit as shown in Figure 1. <br />Critical Mining Width. The width of a mining panel necessary for maximum subsidence to <br />occur; the length of the panel must also be greater than, or equal to, critical panel width for <br />maximum subsidence to occur- Critical width (WQ) commonly ranges from 1.0 to 1.4 times the <br />mining depth (d). <br />Snbcritical Mining Width. The width of a mining panel less than critical width (i.e., less than <br />1.0 to 1.4d). <br />Sapereritical Mining Width. The width of a mining panel greater than critical width. <br />' The focus of Exhibit 60B is on the South of Divide ATningArea_ It is not feasible to quantify <br />subsidence by reference strictly to the permit revision area; to the contrary, it is necessary to <br />evaluate the relevant panels in their entirety. <br />co aawcaaa~e~s3i-o3z~avo~+r~csoa~-:oos.a~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.