My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE52000
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE52000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:56 PM
Creation date
11/20/2007 3:09:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981202SG
IBM Index Class Name
Permit File
Doc Date
9/14/1981
Doc Name
RECLAMATION PLAN AND TIMETABLE
Section_Exhibit Name
EXHIBIT E
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E {Cont'd) <br />dredge facilities nor are there any temporary or large silta- <br />tion structures involved in this operation. There will be no <br />earth dams. See Exhibit G for details concerning water <br />resources. <br />The mining and reclamation plans take into account the <br />safety and protection of wildlife remaining on the mine site, <br />at the processing sites and along all access roads to the mine <br />site. <br />Where it is necessary to remove the topsoil and overburden <br />to reach the mineral deposit, the highest-quality topsoils <br />found on the affected land will be removed in sufficient <br />quantity to implement the reclamation plan. These topsoils <br />will be segregated and protected. I4 the topsoil is not <br />replaced on areas to receive revegetation within a short <br />enough time (not to exceed one growing season) to avoid <br />deterioration of the topsoil, vegetative cover or other means <br />will be employed to preserve the topsoil from wind and water <br />erosion, to protect it from any contamination by acid or toxic <br />materials, and to keep it in a useable condition for sustain- <br />ing vegetation when it is redistributed in accordance with the <br />reclamation plan. Topsoil stockpiles will be maintained to <br />minimize erosion and will be located in areas where disturbances <br />by ongoing mining operations will be at a minimum. The top- <br />soils will be handled as little as possible until they are <br />replaced in disturbed areas. The operator will take measures <br />necessary to insure the stability of the replaced topsoil on <br />-16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.