My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51983
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:55 PM
Creation date
11/20/2007 3:09:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977071
IBM Index Class Name
Permit File
Doc Date
5/24/1977
Doc Name
KASLER & WOODS SAND & GRAVEL 77-71
From
JIM SCHMIEDING
To
MLRB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIMETABLE OF OPERATIONS b RECLAMATION PLAN <br />The operator ie the prime contractor for the coaatruction of hhe Mt. Elbert Conduit <br />U.S, Bureau of Reclamation Department of the Znterior. Thin project requires <br />approximately 115,000 cubic yards oP high qualitq mineral aggregate for bedding and <br />backfill of the 90" conduit. Thin material is not available on the project but ie <br />avallLbls on the applied for ails. The area to be excavated ie dry land and is on <br />a Bide hill. The excavation of this material will be a screening operation with <br />excavation with froatend loaders and trucks and will be excavated to maximum depth <br />of one foot, with all aide elopes no steeper than 3:1. Tho haul road will affect <br />some trees but is ~xi.eting already and will only be improved. The operator proposes <br />to reclaim 5 acres and leave 5 scree to ba used by Lake County at a later date. The <br />area will be planted Co site adapted plsata ae recommended by the United State <br />Forest Sezviee. The topsail from the area (4 to 6 inches) will be etoakpilad end <br />replaced on the site. The operatiog.w111 start on the east aide end the materiel <br />eo placed will be distributed evenly to maintain the slppss at no steeper than 3s1. <br />The area will be graded to drain. <br />=Ysa removal of the material will begin May 31, 1977 with completion oP the processing <br />by September 30, 1977. however a portion of the process material will be stockpiled <br />oa the unrecleimed 5 acres for use on the project in 1978. The reclamation oP the <br />remiiniag 5 scree will be completed by November let, 1977. <br />Td ~ ~ ylR ?. 16.4 <br />V <br />
The URL can be used to link to this page
Your browser does not support the video tag.