My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51963
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:54 PM
Creation date
11/20/2007 3:08:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056A
IBM Index Class Name
Permit File
Doc Date
9/10/2004
Section_Exhibit Name
2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NMD (Panels 12 Right through 16 Right)(PR 99-OS) <br />Twentymile coal Company will continue to mine the reserves it controls in the Twentymile Park Basin. The mine <br />will move its operation into the Northern Mining District as shown on Map 23, Mine Plan Map. TCC controls all <br />of the coal required to mine in this area. TCC projects annual coal production at 10 million tons per year. <br />TCC uses the longwall mining method as the primary technique for ensuring maximum recovery of the resource. It <br />is planned to install a 1000' wide face and panel length ranging from approximately 13,600' to 17,000' in the <br />Northern Mining district during this permit term. The gateroads, main and submains will be developed by <br />continuous miner, as is the current practice. <br />NMD -14 Right Gateroad Alternate Location (MR O1-171) <br />Currently, TCC is in the process of evaluating if the 1000' wide face can be increased to approximately 1200' or <br />wider. The outcome of the evaluation may limit the face width to something less than 1200'. In order to <br />accommodate this uncertainty, and initiate the start of the gateroad, an area is shown in red on Map 23 and 23 B <br />for potential area in which the 14 Right Gateroad will be started. In the event that the evaluation determines that <br />the 1000' wide face is the correct width for TCC's conditions then the location of the gateroad shown on Map 23 <br />and 23 B will be followed. <br />NMD (Panels 17 Right through 21 Right)(PR 03-06) <br />Twentymile coal Company will continue to mine the reserves it controls in the Twentymile Park Basin. The mine <br />will continue its operation into the Northern Mining District as shown on Map 23, Mine Plan Map. TCC projects <br />annual coal production at 10 million tons per year. <br />TCC uses the longwall mining method as the primary technique for ensuring maximum recovery of the resource. It <br />is planned to install a 1000' wide face and panel length ranging from approximately 10,900' to 15,700' in the <br />Northern Mining district during this permit term. The gateroads, main and submains will be developed by <br />continuous miner, as is the current practice. <br />(2) Operation description. A general description and appropriate map(s), prepared in accordance with 2.10, <br />describing the area of land to be affected over the life of operation, according to the anticipated sequence of mining <br />and reclamation, and identifying each area of land for which it is anticipated a new, separate, five-year permit will <br />be obtained and a performance bond will be posted throughout the operation and any change in a facility or feature <br />shown under 2.10 which would result from the proposed operations. <br />The general operation plan for the Foidel Creek Mine is shown on Map 23, Mine Plan. This map shows the <br />planned schedule for the mine advance. <br />Federal Lease COC-54608, with an effective date of February 1, 1996, was issued by the BLM to Cyprus Western <br />Coal Company, which completed federal leasing activities for the EMD. Fee coal was purchased from Chevron, <br />Kenneth and E[hel Ashley, Earl Andis and Paul Swisher for the majority of the fee coal located within the EMD. <br />Twentymile Coal Company holds ownership of the coal located in the E/2 of section 22. <br />PR 03-06 2.05-2.1 03/02/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.