Laserfiche WebLink
NMD (Panels 12 Right through 16 Right)(PR 99-OS) <br />The same mining method utilized in the EMD will be used to extract coal from the NMD, except that the face <br />width is increased to 1000'. The existing surface facilities, including the EMD ventilation site, will be used for <br />mining of coal in the NMD permit area. <br />NMD (Panels 17 Right through 21 Right)(PR 03-06) <br />The same mining method utilized in the southern half of the NMD will be used to extract coal from the northern <br />half of the NMD. All of the existing surface facilities, including the EMD ventilation site, will be used for mining <br />of coal in this part of the NMD permit area. <br />(2) Operation Description <br />(a) Surface mining. A detailed narrative description and appropriate man(s) nreoared in <br />accordance with 2 10 describin¢ the land to be affected within the permit area accordine to the proposed sequence <br />of mining and reclamation Each narrative and/or man shall include a detailed timetable sufficient to describe the <br />various miningphases proposed by the applicant the maximum acreage proposed for each phase of the operations <br />within the permit area must be specified. <br />RESPONSE <br />No surface mining is planned in this application. Therefore, the requirements of this Section are not applicable to <br />the Foidel Creek operation, nor the Fish Creek Tipple operation <br />(b) Undereround minine A detailed narrative and appropriate map(s) prepared accordine to the standards of <br />2 ]0 sufficient to describe all proposed surface disturbances to be associated with the undereround minin¢ <br />activities within the hermit area Each operation plan shall include a narrative cross sections, map(s), and <br />timetable(s) sufficient to describe the aerial extent of the proposed undereround workings and the stratum <br />PR 03-06 2.05-11.1 03/02/04 <br />