Laserfiche WebLink
• <br />Ncws and Inlormanon from Ne Colorado <br />i. iston oC M1Cincrals and Gealow and :hr. <br />~olotado M1lined Land Reclamation Board <br />D1VIG_ ullef~r -November 6 :199:8 ~ _. ~::,,; _ ~ r <br />Colorado Mined Land Reclamation Board Hearing Process: <br />Typically, any application fora ! 12 Regular Operation permi[ or an amendment to a ] 12 Rewlar Operation permit <br />requires a heating before the Mined Land Reclamation Board when there is a written objection. However, prior to the <br />Formal Board Hearing, several other hearings mus[ occur prior to the Formal Board Hearing. <br />• The Informal Conference: <br />The fast of the three hearinss in the process is the Informal Conference. If there aze objections-or at the request of the <br />applicant or local board of county commissioners -the Division will schedule an informal conference among the <br />parries. The informal Conference is held after the close of the required comment period, which is about 50 to 60 days <br />from the date an application is considered filed with the Division. <br />The purposes of the informal conference are to: <br />• Explain the three hearing process to the parties <br />• Identifv the issues <br />• Identify the parties <br />• Determine what issues have been resolved <br />• Determine if any parties want to withdraw <br />The Pre-hearing Conference: ~ <br />The second hearing is the Pre-hearing Conference. It can occur no sooner than te7m days afer the Division has made iu <br />recommendation to approve or deny the application for a permit or amendment. However, it must also occur at least <br />5ve (5) days prior to the Formal Board Hearing. The Pre-hearing Conference is usually conducted by a member of the <br />Mined Land Reclamation Board. The Division is required to mail its recommendation to al] parties prior [o the Pre- <br />hearing Conference. <br />The purposes of the Pre-hearing Conference aze to: <br />• Recommend the issues the full Board should consider ' <br />• Determine the lists of witnesses and exhibits to be presented by the parties at the Formal Public Hearing <br />• Determine the amount of time each party will have to make their presentations at the Forma] Public <br />Hearing <br />• Prepare a Draft Board Order that will be rued to conduct the Formal Board Hearing <br />The Formal Board Hearing: <br />The Formal Board Hearing must be held prior to the automatic approval date for the permit application or the <br />amendment. At the Formal Board Heazing, the fast order of business is for the Board to adop[ the Drafr Board Order. <br />Parties may object to the Drafr Board Order and seek revisions. Once the Draft Board Order is adopted, the Formal <br />Board Hearing begins. <br />On occasion, an operator may have a consultant represent the operator or company. In order to represent the applicant <br />or operator, the Board and the Attorney General's Office have requested that consultanu complete a notarized form of <br />desiwation. For copies of this form contact DMG. <br />Contact: Bruce Humphries, Minerals Program Supervisor <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />(303) 866-3567 FAX: (303)832-8106 <br />Page 2 <br /> <br />