Laserfiche WebLink
Following is an estimate of reclamation costs. Bear in mind that this estimate is based on today's cost and is subject to <br />inflation and economic fluctuations. Changes and revisions made to the accompanying reclamation plan may also <br />affect the total cost. <br /> <br />ITEM <br />DESCRIPTION <br />UNIT <br />QUAN. UNIT <br /> <br />PRICE <br />TOTAL <br />1 Mobilization LS $2,500 <br />2 De-watering LS 35,000 <br />3 Grading and Sloping CY 1,208,000 $2.00 2,416,000 <br />4 Place Top soil CY 62,000 2.00 124,000 <br /> <br />5 Seed, Mulch, Tack, & Fertilize <br /> <br />(All areas except "B") <br />AC <br />42.0 <br />350.00 <br />14,750 <br />6 Planting Area "B" AC 14.5 1,900 27,550 <br />7 Irrigation Area "B° LS 5,000 <br /> Subtotal 2,610,050 <br />8 Indirect Costs LS 52,200 <br /> Subtotal 2,662,250 <br />9 Project Management LS 106,500 <br /> TOTAL $2,768,750 <br />