Laserfiche WebLink
-3- <br />deterrined: <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />not been perfonned, and <br />i. that reclamation required by law to have been performed upon such lands has <br />ii. that financial warranty forfeiture proceedings described in the Act or similaz <br />provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency only <br />where the Division detemunes that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/-I a) Rider is attached. <br />/_.X~/ b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLO~RADO~ D/E~PA~R~T~MENT OF NATURAL RESOURCES <br />RONALD W. CATTANY <br />Division Director <br />