Laserfiche WebLink
~ iii iiiiiiiiiiiii iii <br />~~ <br />GRAND VALLEY COAL COMPANY Second Quarter 7999 <br />WATER SAMPLING REPORT Sampled by: Vicky Miller and Mark Wayment <br />Date: 6/22/99 Meters Calibrated: Yes <br />Weather Conditions: Dry, sunny day (75°), rained yesterday and three weeks ago. <br />Sampling Conditions: Wells bailed prior to sampling <br />SURFACE WATER <br />Sample <br />Point Time Temp (C) pH EC Flow <br />CFS <br />SW-1 2:30 p 27 8.22 1961 5.28 <br />SW-2 11:50 a DRY <br />SW-3 3:30 p DRY <br />SW-5 12:20 p DRY <br />SW-8 3:20 21 8.41 2040 4.24 <br />GROUNDWATER <br />Sample <br />Point Time Temp (C) pH EC SWL (feet) <br />GW-1 2.50 p 15 7.89 3410 6.3 <br />GW-3 3:10 p 12 7.74 3870 18.1 <br />GW-6 3:35 DRY <br />Location of Points/Wells: <br />SW-1 -East Salt Creek above McClane <br />SW-2 -McClane Creek at culvert below mine <br />SW-3 -Munger Creek at haul road culvert below mine <br />SW-5 -McClane Creek above mine site at culvert inlet <br />SW~ -Munger Creek below mine before North split <br />SW-8 -East Salt Creek between Munger and McClane Creeks <br />SW-X -McClane Creek at confluence with East Salt Creek <br />GW-1 -Alluvium of East Salt Creek about 3 miles above McClane <br />GW-3 -Alluvium of East Salt Creek just below Munger Canyon <br />GW~ - In Munger Canyon at the permitted waste rock disposal area <br />