Laserfiche WebLink
.~ <br />E~~i4 <br />s Cosl Company <br />Seneca Coat Compan <br />RECEIVED <br />July 26, 2006 <br />JUL 3 9 2006 <br />Oiviean of Minerals en0 Geology <br />Mr. Daniel Mathews <br />Division of Minerals and Geology <br />101 South 3rd, Suite 301 <br />Grand Junction, CO 81501 <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpond Inspections <br />Dear Mr. Matthews: <br />Enclosed are copies of the second quarter 2006 Stockpond inspections <br />for those structures at Seneca II-W which have been constructed to <br />date. Snspections for Stockponds T-1, T-2, T-3, T-5, T-18, T-20, T-22 <br />and T-24 are included. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />~( Rj9"3'~ <br />Roy Karo <br />Reclamation Manager <br />Enclosure(s) <br />cc. Mr. Michael Boulay <br />V/ Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Seneca Coal Company • P.O. Box 670 • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 . FAX (970) 276-3014 <br />