<br />Colorado Division of Minerals and Geology
<br />ESTIMATING FORM - STRUCTURAL DEMOLITION NORK
<br />Task No.: 054 ------------------------------------------Prepared by RCO
<br />Permit No.: M-99-058 Filename M058-054
<br />Date 27-Jul-99 Operation Yule Quarry
<br />Permitting action Reclamation
<br />sheet 1 of 2
<br />Task description Haul topsoil, remove debris, fencing, trail work
<br />MEANS Location Adjustment: 107.20:6 of
<br />__________________ base unit costs - MEANS SITE NORK 8 LANDSCAPE COST DATA 1947 Edition
<br /> _________
<br />MEANS BASEI
<br />ADJUSTED
<br />STRUCTURE / FACILITY / EOUI PMENT DESCRIPTION I
<br />____________________________ ______:e..c...:.:
<br />_
<br />_
<br />_
<br />= DIMENSIONS
<br />=eco:........c.c::..... ~ COMPOSITION
<br />==e::::::... I QUANTITY
<br />.
<br />=v.:....:: I UNIT
<br />==ee:e:= ~ UNIT LOST ~
<br />=
<br />.... TOTAL LOST
<br />
<br />__________
<br />__________
<br />I
<br />____
<br />Remove temporary fencing, manual toad onto ~
<br />ft 10 x 7 sections I
<br />~ steel galy l
<br />~ 1,620 ~ I
<br />cf l
<br />=ee: v
<br />:I
<br />~ 50.22 ~ :====ee:..=_
<br />5382
<br />flatbed, poles and footers removed, 10-ft ft 10 lengths ~ wood, wire
<br />sections, estimate 60 cy volume, offsite disp ~ wire coiled
<br />osal, wood/wire fence Intl, normal dump fee ~ ~ ~ 10 ~ Load ~ 5100.00 ~ 51,072
<br />Remove cables and curtains from Entry #2, ~ n/a ~ steel cable ~ 270 ~ cf ~ 50.22 ~ 564
<br />haul debris offsite, use of climbing contract ~ ~ synth fabri ~ 30 ~ hr ~ 530.00 ~ 5965
<br />or, manual load onto flatbed or dump truck ~ ~ ~ 2 ~ Load ~ 5100.00 ~ 5214
<br />for landfill, normal fee, estimate 10 cy volu
<br />Remove steel plate decking, use of backhoe, ~ ft 20 x 6 x 1 ~ steel ~ 1 ~ load ~ 5100.00 ~ 5107
<br />offsite haul to salvage in Carbondale via fla ~ ~ backhoe ~ 2 ~ hr ~ 5100.00 ~ 5214
<br />tbed, estimate 10 cy vol ~ ~ crew ~ 4 ~ hr ~ 525.00 ~ 5107
<br />Remove buried fuel pipeline, w! backhoe and ~ ft 100 x 2 in diam ~ steel ~ 135 ~ cf ~ 50.22 ~ 532
<br />manual load onto dump truck, estimate 5 cy vo ~ ~ backhoe ~ 1 ~ hr ~ 5100.00 ~ 8107
<br />fume, normal dump fee ~ ~ crew ~ 2 ~ hr ~ 825.00 ~ 554
<br /> 1 ~ load ~ 5100.00 ~ 5107
<br />Remove surface or shallow buried discharge
<br />line, poly pipe, coil or cut into lengths for ~ LF 600 ` blk poly ~ 540 ~ cf ~ 50.22 ~ 5127
<br />hauling, estimate 20 cy, normal fee ~ ~ ~ 4 ~ load ~ 5100.00 ~ 5429
<br />Remove fuel tank containment membrane, flexib ~ ft 30 x 40 ~ HDPE ~ 81 ~ cf ~ 50.22 ~ 819
<br />le plastic, manual handling, estimate 3 cy ~ ~ no contamin ~ 1 ~ load ~ 5100.00 ~ 5107
<br />dump truck
<br />Remove fuel tank and oil tanks, steel, mist ~ waste oil 500 gals ~ of l,fluids ~ 500 ~ gal ~ 510.00 ~ 55,360
<br />sizes, special disposal of vessels and fluids ~ drums 10 of 55 gal ea ~ steel ~ 10 ~ drum ~ 540.00 ~ 5429
<br />flatbed and loader handling, haul to proper ~ tank 10' diam x 20'L ~ steel ~ 1 ~ unit ~ 51,000.00 ~ 51,072
<br />facility, estimate 500 gals waste oil, estima ~ ~ ~ 2 ~ load ~ 5500.00 ~ 51,072
<br />to ten drums and one large tank to haul
<br />Install 4-inch drain pipe at lower portal, ~ LF 300 x 4 in diam ~ PVC ~ 300 ~ if ~ 54.50 ~ 51,447
<br />PVC, buried across bench, surface down slope, ~ plus fittings ~ PVC ~ 20 ~ pcs ~ 510.00 ~ 5214
<br />anchored w/ collars and strapping to prevent
<br />slippage downhill, manual burial and handling ~ installation ~ n/a ~ 30 ~ hrs ~ 520.00 ~ 5643
<br />estimate length at 300 ft, plus screen sump
<br />TASK SUBTOTAL - sheet 1 514,346