Laserfiche WebLink
<br />Colorado Division of Minerals and Geology <br />ESTIMATING FORM - STRUCTURAL DEMOLITION NORK <br />Task No.: 054 ------------------------------------------Prepared by RCO <br />Permit No.: M-99-058 Filename M058-054 <br />Date 27-Jul-99 Operation Yule Quarry <br />Permitting action Reclamation <br />sheet 1 of 2 <br />Task description Haul topsoil, remove debris, fencing, trail work <br />MEANS Location Adjustment: 107.20:6 of <br />__________________ base unit costs - MEANS SITE NORK 8 LANDSCAPE COST DATA 1947 Edition <br /> _________ <br />MEANS BASEI <br />ADJUSTED <br />STRUCTURE / FACILITY / EOUI PMENT DESCRIPTION I <br />____________________________ ______:e..c...:.: <br />_ <br />_ <br />_ <br />= DIMENSIONS <br />=eco:........c.c::..... ~ COMPOSITION <br />==e::::::... I QUANTITY <br />. <br />=v.:....:: I UNIT <br />==ee:e:= ~ UNIT LOST ~ <br />= <br />.... TOTAL LOST <br /> <br />__________ <br />__________ <br />I <br />____ <br />Remove temporary fencing, manual toad onto ~ <br />ft 10 x 7 sections I <br />~ steel galy l <br />~ 1,620 ~ I <br />cf l <br />=ee: v <br />:I <br />~ 50.22 ~ :====ee:..=_ <br />5382 <br />flatbed, poles and footers removed, 10-ft ft 10 lengths ~ wood, wire <br />sections, estimate 60 cy volume, offsite disp ~ wire coiled <br />osal, wood/wire fence Intl, normal dump fee ~ ~ ~ 10 ~ Load ~ 5100.00 ~ 51,072 <br />Remove cables and curtains from Entry #2, ~ n/a ~ steel cable ~ 270 ~ cf ~ 50.22 ~ 564 <br />haul debris offsite, use of climbing contract ~ ~ synth fabri ~ 30 ~ hr ~ 530.00 ~ 5965 <br />or, manual load onto flatbed or dump truck ~ ~ ~ 2 ~ Load ~ 5100.00 ~ 5214 <br />for landfill, normal fee, estimate 10 cy volu <br />Remove steel plate decking, use of backhoe, ~ ft 20 x 6 x 1 ~ steel ~ 1 ~ load ~ 5100.00 ~ 5107 <br />offsite haul to salvage in Carbondale via fla ~ ~ backhoe ~ 2 ~ hr ~ 5100.00 ~ 5214 <br />tbed, estimate 10 cy vol ~ ~ crew ~ 4 ~ hr ~ 525.00 ~ 5107 <br />Remove buried fuel pipeline, w! backhoe and ~ ft 100 x 2 in diam ~ steel ~ 135 ~ cf ~ 50.22 ~ 532 <br />manual load onto dump truck, estimate 5 cy vo ~ ~ backhoe ~ 1 ~ hr ~ 5100.00 ~ 8107 <br />fume, normal dump fee ~ ~ crew ~ 2 ~ hr ~ 825.00 ~ 554 <br /> 1 ~ load ~ 5100.00 ~ 5107 <br />Remove surface or shallow buried discharge <br />line, poly pipe, coil or cut into lengths for ~ LF 600 ` blk poly ~ 540 ~ cf ~ 50.22 ~ 5127 <br />hauling, estimate 20 cy, normal fee ~ ~ ~ 4 ~ load ~ 5100.00 ~ 5429 <br />Remove fuel tank containment membrane, flexib ~ ft 30 x 40 ~ HDPE ~ 81 ~ cf ~ 50.22 ~ 819 <br />le plastic, manual handling, estimate 3 cy ~ ~ no contamin ~ 1 ~ load ~ 5100.00 ~ 5107 <br />dump truck <br />Remove fuel tank and oil tanks, steel, mist ~ waste oil 500 gals ~ of l,fluids ~ 500 ~ gal ~ 510.00 ~ 55,360 <br />sizes, special disposal of vessels and fluids ~ drums 10 of 55 gal ea ~ steel ~ 10 ~ drum ~ 540.00 ~ 5429 <br />flatbed and loader handling, haul to proper ~ tank 10' diam x 20'L ~ steel ~ 1 ~ unit ~ 51,000.00 ~ 51,072 <br />facility, estimate 500 gals waste oil, estima ~ ~ ~ 2 ~ load ~ 5500.00 ~ 51,072 <br />to ten drums and one large tank to haul <br />Install 4-inch drain pipe at lower portal, ~ LF 300 x 4 in diam ~ PVC ~ 300 ~ if ~ 54.50 ~ 51,447 <br />PVC, buried across bench, surface down slope, ~ plus fittings ~ PVC ~ 20 ~ pcs ~ 510.00 ~ 5214 <br />anchored w/ collars and strapping to prevent <br />slippage downhill, manual burial and handling ~ installation ~ n/a ~ 30 ~ hrs ~ 520.00 ~ 5643 <br />estimate length at 300 ft, plus screen sump <br />TASK SUBTOTAL - sheet 1 514,346 <br />