Laserfiche WebLink
RECLAMATION COS~MMARY cont'd sh~ 3 of 4 <br />N. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />n/a <br />Subtotal (H): <br />____________ <br />I. EARTHNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description ~ Cost (E) <br />52 ~ Clean out sed pond <br />53 ~ Construct sed pond <br />E393 <br />E295 <br />Subtotal (1): E688 <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cast (S) <br />56 ~ Final grade (spread) topsoil on recl area ~ E577 <br />topsoil hauling not Intl in this task <br />topsoil delivery - see task 59 below <br />Subtotal (J): E517 <br />