Laserfiche WebLink
• C 1 R C E 5 Cost Estimating Sof [ware <br />EARTHVORK FORM - BULLDOZER WORK <br />Agency or organization name DMG <br />Task # : 056 State Colorado Permit # M-99-058 <br />Date 07/27/99 County Gunnison Abbr. none <br />User RCO Site Yule Quarry Filename M058-056 <br />Permit/job action Reclamation <br />Task description Final grade topsoil on bench and road <br />HOURLY EQUIPMENT COST Basic machine Cat D7H 5.2 (1996) Horsepower 215 <br />_____________________ Blade type Semi-Universal --------- <br /> Attachment k1 ROPS Cab ShifC basis: 1/day <br /> Attachment #2 3-shank ripper --------- <br /> Utilization X (CRG) <br />Cost Breakdown Ownership E/hour 535.67 NA <br />-------------- Operating S/hour 541.23 100 <br /> Ripper op.E/hour 50.00 0 <br /> Operator S/hour 523.12 NA <br /> Total unit E/hour : 5100.01 Total fleet E/hour 5100.01 <br />MATERIAL QUANT [T IES <br />_____________________ <br />_____________________ <br />Initial <br />Swell <br />Loose <br />volume : 1,936 LCY factor : HA volume 1,436 LCY <br />Source of quantity take-off Applicat ion, map <br />Source of est. swell factor NA <br />HOURLY PRODUCTION <br />______ __________ Job Condition Correct ion Factors <br />Avg. push distance 75 ft. --------------------- -----------^ <br /> --------- Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.20 (CAT HB) <br />dozer production 704 LCY/hr Dozing method..... 1.00 (gen.) <br /> --------- Visibility........ 1.00 (avg.) <br />Material consistency description Job efficiency.... 0.83 (tsh/day) <br />Loose stockpile Spoil pile factor. 0.70 (fnd-mf) <br />-------^------------------------------ -Push gradient..... 1.00 (CAT HB) <br />Avg. push gradient 0.00 X (pos) Altitude deration. D.93 (CAT HB) <br /> --------- ~ Material weigh[... 1.10 (CAT HB) <br />Avg. site altitude 9,400 ft. Blade type........ 1.00 (S or U) <br />Material weight 2,100 lb/LCY Net jab correction 0.53 <br />Mat. description --------- - -----------^ <br />Earth - Loam Adjusted unit prod.: 374.75 LCYjhr <br /> Adjusted fleet production 374.75 LCY/hr <br />JOB COST - ------------ <br />Fleet size 1 Dozers) Total job time 5.17 Hours <br />Unit cost 50.267 /LCY Totat job cost 5516.66 <br />