Laserfiche WebLink
AmerAha, Inc MWU•2 Drilling and CompleUOn Report <br />MW'I I-2. This was followed by a quick recovery +vhen drilling of 11\VA-2 was suspended on <br />December 20. 1999, so that casing could be set through the Pinta-Cirecn River intrrv~al. Qn <br />January y. 20011. +vhen drilling resumed in M W'A-2. only a minor atnount of dra+vdo++m ++as <br />observed in MN'l'-? Phis would be expected since the pinta-Green River intcn•al had been <br />cased off in Iv1\\ ~1-_. Beginning on January h, 2000, drilling of the Uinta-(ircen River interval <br />in M1l\\'B-_' produced more than 31 feet of dra+vdown in ~f14'l'-_, followed again by a rapid <br />recoven period. <br />~1\VI ~-' was not monitored by personnel from Duub K Associates. Inc., during drilling of <br />'+11~'U-2. nor during the early stages of the drilling of M\\'D-l . 1>ata collected bet+veen <br />lanuan 19 :utd '_?. ~OOU. ++hile MV6'D-1 +vas being drilled through the lo+cer Pinta-(inun River <br />uucrcal. R-S lime. uud :1-Groove. indicate that about b feet of dra++du++n occurred in \4\L'1_'-_. <br />t'ullcctivcly, the data sho++•n in Figure R clearh indicate the dynamic nature of the Pinta-Green <br />IZivcr ayuiler system. The daw in fable d and Figure K, when coupled with the ++mtnr-discharge <br />' data in the various wells mentioned above, should allow calculation i+f basic grcntnd++atrr Ilo+c <br />. p:u;uneters. <br />1 <br />_. 1 <br />1 <br />