Laserfiche WebLink
1 <br /> plant will be located in the general processing area located on the pit <br />' floor. The plant is a Boing drum mix plant that uses a dry clone scrubber. <br /> Thus, the use of scrubber ponds to collect waters is unnecessary. The <br /> product will then be hauled from the pit to the job site. <br /> Operations are planned to begin on the southerly side of the permit <br />' area and work in northerly, easterly, and westerly directions. Initially, <br /> it is likely that aggregate will be removed and hauled directly to the <br /> ' <br /> s permanent plant site (located a few miles away) in order to <br />company <br />' create sufficient space for processing and stockpiles, which are <br /> illustrated on the Exhibit C map as they are anticipated to be located. <br />' However, it is likely that the process may move somewhat in order to be <br /> closer to the actual mined area as the pit expands. <br /> d <br /> The powerline illustrated on the Exhibit C map is overhead an <br />' suspended by widely-spaced poles. An agreement will be developed with the <br /> power company to relocate the poles as necessary to accommodate the <br />operation. <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br />1 <br />