Laserfiche WebLink
Yagn Twn <br />Mr. Robert TLreh <br />June B, 1978 <br />B. Mining Timetable - Ae stated in thn rules and <br />regulations (pg. 15), a mining timetable ie required <br />for the various stages of the operation. The ateff <br />suggests s table with the following heading: <br />Strip Herber - Year Begia Overburden Removal - Year <br />Begin Limestone Removsl <br />Your beet estimates is all we expect. Changes to [his <br />timetable can De made in the future, if naeeeeary, <br />through techaieal revision. <br />C. Acreage of ex~or, moderate and minor disturbaaee should <br />be given over the life of the mina using criteria given <br />in the rules and regulations (pg. 14-15). <br />D. As stated in the rules and regulations (pg. 15), the <br />nature, depth and this sea or the ore body or deposit <br />to be mined and the M~~ and thiekaesa of the over- <br />burden to be removed is required. <br />3. Sahibit E - Reclamation PLa <br />A. Reclamation timetable - Tha rules and regulations <br />(pg. 16) require an estimate of the period of time <br />!squired for each phase of raciamtiou sad the size <br />of each area to 6e reclaimed duriag each phase. The <br />staff suggests a table with the fo11ow1ng heading: <br />Strip Humber - Acres - Begin Grading - Hagan Topaoiling - <br />Begin Fertilization and Seeding <br />Again. if dates change in the future. changes to the <br />tisatabls tan be mde by tachniaal revision. <br />B. Ths reclamtion plans need to address the following <br />-_ areas morn apecitically: <br />1. Beading - types, miztures and quantities to ba used. <br />2. fsrt111sation - mixture and quantities if need. <br />3. topsoiling - anticipated minimum depth or ranee <br />of depth of topsoil eprend over wined out area., <br />4. Exhibit F - Reclamation Plan Maps <br />A. Tha location of the haul toed needs to be shown on the <br />reclamation map mace it will remain after reclamation. <br />