My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51767
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Permit File
Doc Date
12/9/1996
Section_Exhibit Name
Exhibit 13 Disposal Area Stability Report
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• <br />• <br /> <br />indicate a narrow, probably shallow zone of soils will exist at the toe with shallow <br />bedrock on the side slopes, then k may be possible to plan to remove all soils below <br />the toe (and up the valley sides a specified distance). Observation of the excavation <br />with shallow test pits during construction could confirm adequate conditions. For <br />fills in milder sloping areas where deeper colluvial soils are anticipated, test borings <br />or pits prior to construction are recommended to evaluate soil conditions. <br />The scope of investigation and design should evolve as investigations are <br />completed. Confirmation of reduced scope investigations by the CDMG will need to <br />be negotiated. The use of the stability analysis from this investigation along with <br />compiled engineering properties from site specific investigations should allow for <br />more efficient investigation/design procedures. <br />LIMRATIONS <br />The analyses and conclusions presented in this report are preliminary and <br />based on the conditions described in the report. Additional site specific <br />investigations and quarterly inspections as discussed in the report will be required. <br />We believe this study was performed using methods and procedures consistent with <br />other professionals practicing geotechnical engineering in this area at this time. No <br />other warranty, express or implied, is made. <br />It has been our pleasure to serve you on this project. If we can clarify our <br />opinions or be of further service in discussing the contents of this report, or in <br />analyses of other technical issues associated with this project, please call. <br />~~ <br />Mark G. Gf~ <<~„a~. <br />Project Ma ~Z~o <br />-1~ -., <br />n, M . <br />(1 copy sent) -' , <br />LORENCITO COAL COMPANY <br />CTLR 25,751 <br />Red by: /"j, <br />Ronald M. McOmber, PE <br />-_ Principal <br />f <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.