Laserfiche WebLink
<br />-3- <br />determined: <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />i. that reclamation required by law to have been performed upon such Iands has <br />not been performed, and <br />ii. that financial warranty forfeiture proceedings descn'bed in the Act or similar <br />provisions of subsequent laws, if arty, have been initiated <br />c) The Division, acting for the Board, will enter lands to respond to an emergency only <br />where the Division determines that arty of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/_/ a) Rider is attached <br />/ XX / b) No rider is attached <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B ONG <br />Division Director <br />