My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : dz1 <br />Date : 1 1/1 820 03 <br />User : BHM <br />State :Colorado <br />County : La Plata <br />Site :Oakridge Energy <br />Agency or organization name : Lewicki And Assc. <br />Permit or other job action :Final Rec <br />Task description :Task 2 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Initial <br />volume : 11.220 <br />Basic machine : Cat D9R - 9SU Horsepower : 405 <br />Blade type : Semi-Universal ' <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Ownership cosUhour : $54.81 NA <br />OperatingwsUhour : $76.74 80 <br />Ripper op. cost/hour : $4.73 40 <br />Operator cosUhour : $27.99 NA <br />Total unit cost/hour : $164.27 Total fleet cosUhour : $164.27 <br /> <br />BCY <br />Swell Loose <br />factor : volume : 18,700 LCY <br />Source of estimated volume :ACAD <br />Source of estimated swell factor : t <br />HOURLY PRODUCTION <br />Average push distance : 120 feet <br />Unadjusted hourly production : 1,093.1 LCY/hr <br />Material consistency description <br />Rock, poorly ripped or blasted <br />Average push gradient : 1.00 % (I <br />Average site altitude : 7,000 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Sandstone <br />1.667 <br />Operator skill : 0.75 <br />Material consistency : 0.60 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.99 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.27 <br />Source <br />Adjusted unit production : 291.34 LCY/hr <br />Adjusted fleet production : 291.34 LCYlhr <br />Total job time : 64.19 <br />Total job cost : $10,544 <br />Permit/job# :080 <br />Abbreviation :none <br />Filename :0080-dz1 <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.