Laserfiche WebLink
TrucWLoader Team Work conE`d Task # : tr3 sheet 2 of 2 <br />Loading Tooi Cvele Time : Number of loading tool passes required to fill truck : 3 passes <br />Excavators and hom shovels -macKme cycle time vs. job condition rating : NA <br />-selected value wi0iin basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle time elemerds (min,) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : 0.550 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : No adjustment - fector not applicable 0.000 {Cat HB) <br />Stockpile : No edjustment -factor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment - iactor not applicable 0.000 (Cat HB) <br />Dump target : Nominal target ~ 0.000 (Cat HB) <br /> Net cycle time adustment : O.OIXI minutes <br /> Adjusted basic cycle time : 0.550 minutes <br />Net load time per truck (bulk of first loader pass completed during truck exchange) : 1.200 minutes <br />Truck Cvcle Time <br />Truck exchange time: 0.50 minutes........ Adjusted for site altitude : 0.50 mimrtes <br />Truck load time: 1.200 minutes........ Adjusted for sde atikude : 1.20 minutes <br />Truck maneuver and dump time: 0.90 minutes........ Adjusted for ske altitude : 0.90 minutes <br />Truck travel (haul & return) time: <br />Road condition description :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul route <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (°h) Speed <br />feet/minute Travel time' <br />(minutes) <br />i 1,200 9.00 5.00 14.00 857 1.89 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time " : 1.89 minutes <br />minUtes <br />minutes <br />Loading tool unit production : 563.16 LCY/hour...... Adjusted forjob efficiency : 467.42 LCY/hour <br />Truck unit production : 189.87 LCY/hour...... Adjusted for job efficiency : 157.59 LCYRrour <br />Optimal no. Wckslloading tool : 3 bucks........... Selected no. truckstloader : 3 trucks <br /> Adjusted houry truck team production : 472.78 LCY/hr <br /> Adjusted hourly single truck/loeder team production : 467.42 LCYIhr <br /> Adjusted houdy multiple truckAOader team production : 934.85 LCYIhr <br />JOB TIME AND COST <br />Fleet size : 2 Team(s) Total job time : 252.07 Hours <br />Unit cost : $0.791 ILCY Total job cost : $188,900 <br /> <br />• first and bri sepme,as edjuated for aculeretloNdacel°ration Return time " : 0.55 <br />°nme snovm ioewdes arenwo adjusimarn Total truck cycle time : 5.04 <br />