My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task # : tr1 sheet 2 of 2 <br />Loading Tool CVC1e Time ~: ~ Number of loading tool passes required to fill truck : 3 ~~ passes <br />Excavators and fromshovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle time elemems (min.) : Load : NA Maneuver : NA Dump : 0.100 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : 0.550 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : No adjustment -factor not applicable 0.000 (Cat HBJ <br />Stockpile : No adjustment -factor not applicable 0.000 (Cat HB) <br />Truck ovmership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment -factor not applicable 0.000 (Cat HBj <br />Dump target : Nominal target 0.000 (Cat HB) <br />Net cycle time adjustment : 0.000 minutes <br />Adjusted basic cycle lime : 0.550 minutes <br />Net load time per truck (bulk of first loader pass completed dudng Wck exchange) : 1.200 minutes <br />Truck Cvele Time <br />Truck exchange time: 0.50 minutes........ Adjusted for sde akitude : 0.50 minutes <br />Truck load time: 1.200 minutes........ Adjusted for site altitude : 1.20 minutes <br />Track maneuver and dump time: 0.90 minutes........ Adjusted for ske altitude : 0.90 minutes <br />Tmck travel (haul & return) time: <br />Road condition description :Rutted dirt, little maintenance, no water, 2" fire penetration <br />Haul route <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />feef/minute Travel time' <br />(minutes) <br />f 1,250 4.00 5.00 9.00 949 1.3B <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route <br />1 <br />-4.00 I 5.00 <br />Haultime": 1.38 minutes <br />1.00 3520 0.56 <br />• nrec.aa lax aepmeMS aaicxaa ror aaeloretlonlaecalarenoa <br />"tiure sh°vm indutlas aaiWtle atljustm°M <br />Return time'" : 0.58 minutes <br />Total truck cycle time : 4.54 minutes <br />Loading tool unit production : 532.72 LCYlhour...... Adjusted forjob effidency : 442.16 LCYlhour <br />Truck unit production : 199.45 LCYBtour...... Adjusted for job etficiency : 165.54 LCYRrour <br />Optimal no. trucksAoading tool : 3 trucks........... Selected no. Wckslloader : 3 trucks <br /> Adjusted hourly track team production : 496.62 LCY/hr <br /> Adjusted hourly single truck8oader team production : 442.16 LCY/hr <br /> Adjusted houry multiple truck8oaderteam production : 442.18 LCYRv <br />JOB TIME AND COST ... -. _ .- . .. - ~ -- . <br />Fleet size : 1 Team(s) Tonal job time :. 189.41 Hours <br />Unk cost : $0.955 /LCY Total job cost :' $79,978 <br /> <br />