My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TrucklLoader Team Work cont'd Task # : h6 sheet 2 of 2 <br />Loadinn ToolCvcle Time: Number of loading tool passes required to fill Wck : ~ 3 ~ passes <br />Excavators and from shovels -machine cycle time vs. job condition rating : NA <br />-selected value vAtltin basic rating : NA <br />Track baders - matedal descr.: NA <br />-cycle lime elemems (min.) : Load : NA <br />NA Dump: 0.100 <br />Wheel and track loaders -unadjusted basic cyde time (load, maneuver, and dump) : 0.550 minutes <br />Cycle Time Factors Loading Condition Description Parlor (min.) Source <br />Matedal : No adjustment -factor not applicable 0.000 (Cat HBj <br />Stockpile : No adjustment -factor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment -factor not applicable 0.000 (Cat HB) <br />Dump target : Nominal target 0.000 (Cat HBj <br /> Net cycle time adjustmem : 0.000 ~ minutes <br /> Adjusted basic cyde time : 0.550 minutes <br />Net load time per truck (bulk of first loader pass completed during truck exchange) : 1.200 minutes <br />Truck Cvcie Time <br />Truck exchange time: 0.50 minutes........ Adjusted for stte altiWde : 0.50 minutes <br />Truck load time: 1.200 minutes........ Adjusted for site akrtude : 1.20 minutes <br />Truck maneuver and dump time: 0.90 minutes.:...... Adjusted for site altiWde : 0.90 minutes <br />Truck travel (haul & return) time: <br />Road condition descdption :Rutted dirt lithe maintenance, no water, 2"h're penetration <br />Haul route <br />Road <br />seg. # Haul distance <br />feet Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (°h) Speed <br />feeUminute Travel lime' <br />(minutes) <br />1 1,160 2.60 5.00 7.60 1177 1.06 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : Haul time " : 1.06 <br />1 1,160 -2.60 5.00 2.40 3360 0.55 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ninnies <br />' first ara last sepmants Wustetl for aeceleratl°Ndecalerotion Return time " : 0.55 minutes <br />-rime shown indudes amwde aaiustnant Total truck cycle time : 4.21 minutes <br />Loading tool unit production : 563.16 LCYRtour...... Adjusted forjob effidenury : 467.42 LCYlhour <br />Truck unit production : 227.27 LCYlhour...... Adjusted forjob eifidency : 188.64 LCYRtour <br />Optimal no. truckslloading tool : 2 trucks........... Selected no. truckslloader : 2 trucks <br /> Adjusted hoary truck team production : 377.27 LCY/hr <br /> Adjusted hourly single Wddloader team production : 377.27 LCYRtr <br /> Adjusted hourly multiple truddloader team production : 377.27 LCYIhr <br />,... .. <br />JOB TIME AND COST z' ., ~• ... .. ~. ,... .. <br />. Fleet size : 1 Team(s) Total job time : 18.71 Hours <br />Unit cost : $0.934 /LCY _ Total job co ~ B,v'90d ~~ - u <br />
The URL can be used to link to this page
Your browser does not support the video tag.