My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51749
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:47 PM
Creation date
11/20/2007 3:03:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992080A
IBM Index Class Name
Permit File
Doc Date
7/8/2004
Section_Exhibit Name
Appendix 5-7 Bonding Calculations
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />MOTOR GRADER WORK <br />Task # : gig <br />Date : 1125/1003 <br />User : BHM <br />State :Colorado PermiUjob # :080 <br />County : La Plata Abbreviation :none <br />Site : Oakridge Energy Filename :008092 <br />Agency or organization name : L And Assc <br />Pennit or other job action :Task 15 <br />Task description :Task 15 <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14H <br />Attachment no. 1 : NA <br />Attachmentno.2:NA <br />Cost Breakdown Ownership cost/hou <br />Grader operating cost/hou <br />Ripper operating cost/hou <br />Operator cosUhou <br />Total unit cosUhou <br />MATERIAL QUANTITIES <br />Total area to be graded or ripped : 4.25 <br />Source of estimated acreage : ACAD <br />HOURLY PRODUCTION <br />Selected application :Finish grading (0-2.5 mph) <br />Average grader speed : 1.25 mph <br />Selected blade angle : 30 degrees <br />Effective blade length : 12.10 feet <br />Width of blade overlap per pass : 2.00 feet <br />Net grading or ripping width per pass : 10.10 feet "' <br />Unadjusted hourly unit production : 1.5303 acres/hour <br />Job Condition Correction Factors <br />Average site altitude : 7,000 feet <br />• at 0 degrees, blatle ie perpendicular <br />to direction of travel. <br /> Data source : (CRG) <br /> Utilization <br />: $36.44 NA <br />: $35.32 80 <br />: $0.00 NA <br />: $28.18 NA <br />: $99.93 Total fleetcosUhour: $99.93 <br /> r <br />r <br />r <br />r <br />r <br />acres <br />'• width of upper beam on ripping applications <br />Horsepower : 215 <br />Shift basis : 1 per day <br />Altitude adjustment factor <br />Job efficiency adjustment factor <br />Net job cortection <br />Adjusted hourly unit production : 1.2242 acres/hour <br />Adjusted houdy fleet production : 1.2242 acres/hour <br />JOB TIME AND COST <br />Fleet size : 1 grader(s) <br />Unit cost : $81.63 per acre <br />Source <br />1.00 (Cat HB) <br />0.80 (lsh/d, adv.) <br />0.8000 multiplier <br />Total job time : 3.47 hours <br />Total job cost ~ ~ 7" <br />
The URL can be used to link to this page
Your browser does not support the video tag.