My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO22500
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO22500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:33 PM
Creation date
11/20/2007 3:03:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980003
IBM Index Class Name
Hydrology
Doc Date
1/14/1993
Doc Name
H-G COAL CO PN C-80-003 TR-060 FOUR SEDIMENT POND CERTIFICATIONS AND AS BUILT MAPS
From
H-G COAL CO
To
DMG
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATION <br />On January 12, 1993 I reviewed the as-built survey of the 001 Truck <br />Loop Sedimentation Pond (formerly known as 006 Tipple Pond "A") to <br />determine its compliance with CMLRD Rule 4.05.6(3)(d) requiring <br />that this pond be fitted with two separate spillways separated by <br />an elevation difference of at least one foot. <br />I am a registered Professional Engineer in the State of Colorado <br />and am experienced in the design and supervision of earthen <br />construction. I have reviewed the certified survey of this <br />structure performed by Peter Epp (Colorado P.L.S. No. 14815) on <br />December 22, 1992. I have also reviewed the previous as-built <br />certifications by Jerry E. Snider (Colorado P.E. No. 17570) dated <br />April 14, 1986 and myself dated February 6, 1991. In addition to <br />the above, I have discussed the modification made in 1992 with <br />Juan. P. Garcia who supervised the actual modification. This <br />modification to bring this structure in compliance with CMLRD Rule <br />4.05.6(3)(d) was to add a new 12" CMP spillway at an elevation 1.1" <br />above the existing standpipe structure. The existing standpipe <br />structure is the primary spillway and the new 12" CMP is now the <br />emergency spillway. <br />I hereby certify this modification as bringing this structure into <br />compliance with CMLRD Rule 4.05.6(3)(d). <br />_ J <br />Ro ert G. Trumbly, Jr. <br />Colorado P.E. No. 16957 <br />~~/ 3 -~~ <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.