My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO22463
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO22463
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:31 PM
Creation date
11/20/2007 3:01:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Hydrology
Doc Date
4/8/2005
Doc Name
1st Qtr 2005 Review Memo
From
BGW
To
File
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />DIVISION O F <br />MIN SRALS <br />GEOLOGY <br />REC LAMATION•MIN ING <br />EAFETT•SCIENCE <br />Interoffice MEMORANDUM BillOwens <br />Governor <br />to: C-1982-056, Coal Refuse Pile Inspection Report Russell George <br />Ezecutive Direttor <br />from: Byron G. Walker <br />Ronald W. Cattany <br />ee: Dan Hernandez, (e-mail) Division Director <br />subject: Review of 1st Quarter 2005 Inspection Report, Foidel Creek Mine, C-198'~at0`~~esource7rustee <br />date: Apri18, 2005 <br />Table of Contents <br />Table of Contents ........................................................................ ................................................... l <br />Rule 4.09.1(1 l)(a) ....................................................................... ...................................................1 <br />Rule 4.09.1(11)(c) ....................................................................... ...................................................2 <br />Rule 4.10.1(1) ............................................................................. ...................................................2 <br />Rule 4.10.1(1)(b) ......................................................................... ...................................................2 <br />Rule 4.10.2(1) ............................................................................. ...................................................2 <br />Rule 4.10.2(2)(a) ......................................................................... ...................................................2 <br />Rule 4.10.2(2)(b) ......................................................................... ...................................................2 <br />Rule 4.10.2(2)(c) ......................................................................... ...................................................3 <br />Rule 4.10.2(2)(d) ......................................................................... ...................................................3 <br />Rule 4.10.2(3) ............................................................................. ...................................................3 <br />CDMG Policy Memorandum, 7/13/84 ........................................ ...................................................3 <br />Rule 4.09.1(1 I)(a) The fill shall be inspected for stability by a registered engineer or other <br />qualified professional specialist experienced in construction of earth and rockf:ll embankments <br />under the direction of a qualified professional engineer at least quarterly throughout the <br />construction and during the following critical construction periods: (1)removal of all organic <br />material and topsoil, (2)placement of underdrainage systems, (3) installation ofsurface drainage <br />systems, (4) placement and compaction offill materials, and (5) revegetation. <br />The subject inspection was a quarterly inspection accomplished throughout construction, not one <br />of the critical construction periods. The report does states that the inspection was conducted, and <br />a registered engineer certified the report <br />Rule 4.09.1(11)(6) The gualified registered engineer shall provide to the Division a certified <br />report within 2 weeks after each inspection that the fill has been constructed as specified in the <br />design approved by the Division. The report shall include a description of any appearances of <br />Office of Office of Colorado <br />Mined Land Reclamation AQive and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.