My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-11-21_HYDROLOGY - M1991123
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1991123
>
1991-11-21_HYDROLOGY - M1991123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2025 1:25:48 PM
Creation date
11/20/2007 3:01:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991123
IBM Index Class Name
Hydrology
Doc Date
11/21/1991
Doc Name
MEMO IDAHO CREEK RESOURCES FN M-91-123
From
DWR
To
JAMES C STEVENS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1111111111 111111111 OF Colo <br /> �� R9 <br /> ROY ROMER ine err $ JERIS A. DANIELSON <br /> Governor *♦ �n o+ ** State Engineer <br /> /876 <br /> OFFICE OF THE STATE ENGINEER <br /> DIVISION OF WATER RESOURCES <br /> 1313 Sherman Street-Room 818 <br /> Denver, Colorado 80203 <br /> (303) 666-3581 <br /> FAX[3031 866=3589 <br /> November 21 , 1991 <br /> MEMORANDUM <br /> TO: James C. Stevens , Senior Reclamation Specialist <br /> FROM: George D . VanSlyke, Supervising Geologist �jJ� <br /> Division of Water Resources <br /> SUBJECT: Idaho Creek Resources, File No. M-91-123 (� <br /> Section 20, T2N, R68W, 6TH P.M. <br /> Water Division 1 , Water District 6 <br /> We have reviewed the above referenced mining permit application per <br /> your request of October 23, 1991 . The application is to conduct <br /> surface mining of gravel and reclamation . The applicant proposes <br /> to reclaim the site by filling the excavation with water at the <br /> conclusion of mining operations. <br /> Since the mining and reclamation process will expose groundwater to <br /> the atmosphere, the operation will require a well permit from the <br /> State Engineer ' s Office. Also because this area is tributary to an <br /> over-appropriated stream system, a court approved plan for <br /> augmentation will be required . As an alternative, a substitute <br /> supply plan can be submitted to this office for review. <br /> Prior to receiving the above materials, we cannot recommend <br /> approval of the project as described . <br /> cc : Alan Berryman , Division Engineer <br /> Robert Stahl , Water Commissioner NOV 2 a1991 <br /> Mined Land <br /> Reclamation DiviSlor <br />
The URL can be used to link to this page
Your browser does not support the video tag.