Application (2nd Half)
From
Aggregate Industries - WCR Inc.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L -RECLAMATION COST <br />The information in this Section is intended to satisfy the requirements outlined in Section 6.4.12 <br />of the Colorado Mined Land Reclamation Boazd's Construction Material Rules and Regulations. <br />We request that the Division calculate the bond using the information provided below. <br />For the purpose of this estimate we assumed the worst case scenario for disturbance. The largest <br />azea of mining is Phase 2 (approximately 48 acres). We assumed this would be 100% mined. <br />Due to the limited space for stockpile storage at this site, we assumed that Phase lA, Phase 1B, <br />and the side slopes for Phase 2 would be 90% reclaimed. At this point, the ditch crossings would <br />need to be removed, and approximately 4001f of haul road reclaimed to pre-mining state. At this <br />point, we assumed Phase 3 would be SO% stripped of the overburden and 0% mined or <br />reclaimed. To finish reclamation of the site a 3:1 side slope would need to be created between <br />Phase 2 and 3; 3:1 side lopes from existing grade to top of resource would need to be created in <br />the stripped portion of Phase 3; the entire shoreline above the high water line would require <br />topsoil seeding and mulching; the disturbed area in Phase lA and Phase 3 would require topsoil, <br />seed and mulch; and the cottonwood trees would need to be planted. The slurry wall and <br />relocation of the Bull Seep Ditch is to be done at the beginning of mining and therefore would <br />not require any cost estimate for reclamation. <br />Activity Quantity Units Unit Cost Cost <br />A. Phase 1&2: 100% mined, 90% reclaimed <br />1. Create overburden side slopes on mine highwall <br />west side of Phase 2 (26001f) 129,100 CY <br />2. Replace 6" of topsoil on shoreline above high <br />water elevation in Phase 1B & Phase 2, and disturbed TBD by TBD by <br />area in Phase lA 9,950 CY DMG DMG <br />3. Seed and mulch shoreline above high waterline for <br />all of Phase 1B & 2, and disturbed area in Phase lA. 11.3 AC <br />B. Phase 3: OB stripped on SO% (approx. 28 ac.) <br />0% mined or reclaimed <br />1. Create overburden side slopes from finished grade TBD by TBD by <br />to top of resource for stripped area 1,877 CY DMG DMG <br />2. Replace topsoil on entire area 28,600 CY <br />3. Seed and mulch entire area 28.07 AC <br />C. Haul Road and Ditch Crossings <br />1.400 If of haul road reclamation 6" topsoil 300 CY <br />2. Haul Road azea seed and mulch 0.37 AC <br />TBD by <br />TBD by <br />3. Fulton Ditch Crossing -remove rail car and DMG DMG <br />footings and restore crossing area 1 LS <br />4. Bull Seep Ditch Crossing -remove culverts and <br />restore crossin area 1 LS <br />D. Plantings 50 each TBD by TBD by <br />1. Plant 50 Cottonwood Trees DMG DMG <br />Contractor Mobilization (8%) <br />Overhead (18.5%) <br />Administration (S%) <br />~ x ~ a erm <br />dy'M G ^.. rv <br />~.~ <br />x . ~~; ~~ a e ,.<-x <br />AGGREGATE INDUSTRIES - HAZELTINE MINE MLRB 112 PERMIT <br />