Laserfiche WebLink
J <br /> <br /> <br />TABLE 59a <br />SOIL REDISTRIBUTION PLAN <br />Replacement <br />Area Replacement <br />Year Source of Soil <br />Material Acreage Replacement <br />Volume <br />Icy1 Thickness <br />Ift- <br />720 Pit 1983 Stockpile E-3 12.2 11,800 0.5 <br /> 1986 Stockpile E-3 11.8 11,450 0.5 <br /> 1994 Stockpile E-1 48.66 47,100 0.5 <br /> Stockpile E-2 14.1 1 14,100 0.5 <br /> 87.10 84,350 <br /> <br />Pit 1 1995 Stockpile F-1 38.93 40,000 0.5 <br /> Topsoil <br />Windrows 8.84 7,130 0.5 <br /> 47.77 47,230 <br /> <br />Existing OB <br />Stockpile 1994 Stockpile E-3 25.79 21,000 0.5 <br /> 1994 Stockpile E-2 34.71 28,000 0.5 <br /> 60.50 49,000 <br /> <br />Facilities 2000 Stockpile E-3 9.88 7,800 0.5 <br />South Roads 2000 Stockpile E-3 20.66 20,000 0.5 <br />North Roads 2000 Stockpile B-D 1.83 1,500 0.5 <br /> 32.27 29,300 <br /> <br />Pond A 2005 Stockpile E-3 3.04 2,450 0.5 <br />Pond B 2005 Stockpile E-3 3.04 2,450 0.5 <br />Pond C 2005 Stockpile P-C 3.04 2,450 0.5 <br />Pond D 2005 Stockpile E-3 3.04 2,450 0.5 <br />Pond E 2005 No topsoil <br />Removed -- -- -- <br />Pond F 2005 Stockpile P-F 3.04 2,450 0.5 <br />Pond G 2005 Stockpile P-G 3.04 2,450 0.5 <br /> 18.24 14,700 <br />TOTAL 245.98 224,580 <br />APPRQYIri- AE'R 2 5 1995 <br />H:\B57\ V OL.4\59A. TBL <br />01/25/95 12:28pm WP51/cmc Revised - O1 /30/95 <br />iR 13 <br />