Laserfiche WebLink
.' <br />QUARTERLY POND INSPECTION REPORT <br />Pond Inspection Date: October 16,1997 <br />pFcFn~~ ~ <br />OPERATOR: <br />MINE: <br />POND INDENTIFICATION <br />TYPE OF POND <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL <br />SEDIMENT (% total storage) <br />OUTFLOW (cfs) <br />FEATURES <br />EROSIONAL <br />Rill & Gulleys <br />Inadequate Vegetation <br />Outlet Channe] Erosion <br />Burrows <br />Other <br />STRUCTURAL <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other <br />APPURTENANT STRUCTURES <br />Defective Spillways <br />Dewatering Devicies Clogged <br />Faulty Gates, Etc. <br />Other <br />MAINTENANCE REQUIRED <br />Terror Creek Company <br />Terror Creek Loadout ~~T ~ 7 X99] <br />P-1 DugouGr, ~, ,,,,~~erais 4 Geelo~y <br />Sediment Sediment <br />See Comments <br />0% <br />0 <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />Dry <br />N/A <br />0 <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />ADDITIONAL COMMENTS: The design sediment level is 18"below the invert of the <br />primary spillway. The water level in the sediment pond was about 18"below the invert <br />of the primary spillway. <br />REFERENCE DRAWINGS: Sediment Pond - Map 7; SWMP Controls -Map 14; <br />Dugout Pond - Exh 9, page 11. <br />SWMP CONTROLS: No significant amount of coal was spilled azound the Loadout. The <br />hydraulic oil tank at the Loadout was sound. The sediment Fences were in good repair. <br />The plant roads were adequately watered. The paved haul road did not have excessive <br />amounts of coal spillage. <br />a\ <br />Thomas C. Anderson Date <br />Colorado Registered Professional Engineer No. 14726 <br />XB~W <br />