Laserfiche WebLink
Py1-IIBIT G - WATER II4FORP/~,TION: <br />The water requirements for this operation will be minimal. <br />The only water requirements will be for a dust scrubber on the <br />crusher and for dust control of working area and residual stock- <br />piles, The daily estimated use of this water is 5,000 gallons, <br />Arrangements have been made to utilize an existing well belonging <br />to J.J. & P. Bauer located on N2NE4f Sec. 24--550' East of Parcel A. <br />A pipeline will be installed to the crusher site and a 3000 gal. <br />tank will be used on the location. <br />EXHIBIT K - CLIMATE: <br />The climate of this area is classified as semi-arrid with <br />annual precipitation average of 14" per year. <br />-B- <br />