Laserfiche WebLink
e <br />ENGINEER'S CERTIFICATE <br />OF <br />CONSTRUCTION <br />In accordance with Rule 4, Part 4.03.1(I)(d) of the Rules and Regulations of <br />the Colorado Mined Land Reclamation Board pursuant to the Colorado <br />Surface Coal Mining Reclamation Act 34-33-101 et seq., I, Curtis M. <br />Belden, hereby certify that, to the extent possible, Seneca 11 Mine Haul <br />Road FI was constructed according to the approved design dated 7-02-82. <br />Minor field adjustments in horizontal and vertical alignment were neces- <br />sary during construction to compensate for unanticipated natural condi- <br />tions, achieve the flattest practical grade, limit the disturbed area, and <br />construct on alignment consistent with the existing and reclaimed topo- <br />graphy. To the best of my knowledge and belief, field adjustments made <br />during construction did not exceed the limitations of grade or slope pre- <br />scribed under the Rules and Regulations. <br />~ 23 ~3 <br />Date <br />Curtis M. Belden <br />Colorado P.E. 17274 <br />