Laserfiche WebLink
,. <br />HON ~~'.~KE <br />~ III IIIIIIIIIIIII III <br />ALAN D. COX <br />CORPORATE MANAGER. ENVIRONMENTAL AFFAIRS <br />;FCEIVED <br />JAis 2 2 1999 <br />~~;s & Geolo9Y <br />State of Colorado <br />Division of Minerals and Geology <br />Durango Field Office <br />484 Turner Drive, Suite F101 <br />Durango, CO 81301-7910 <br />~ Received <br />`SAN 3 91y99 <br />~bpn~~0 F~1d Otlice <br />~ ~~~ 3 Geology <br />January 8, 1999 ®~pit, <br />~/ ~ ~~C ~~ ~ F/C~ <br />a~'/j'~, '~' ~~ z C~~°Y <br />~`J~ioG~S y /?e _ - a <br />CERTIFIED MAIL -RETURN RECEIPT REQUESTED P 298 872 175 <br />Attn: Mr. Steve S. Shuey, Reclamation Specialist <br />RE: Bulldog Mine Reclamation Proiect <br />Infiltration Trench Monitoring <br />December, 1998 Monthly Report <br />Dear Mr. Shuey: <br />Pursuant to the Technical Revision to the Reclamation Permit for the Bulldog Reclamation Project <br />pertaining to installation and operation of an infiltration trench to accommodate seepage from the 9360 <br />adit, attached is a copy of the monthly monitoring data and associated water quality analyses. This is <br />the fourteenth monthly report as required under the approved TR. <br />We continue to control and manage seepage water emanating from the adit. Seepage flows were <br />directed into the infiltration trench at all times. Flow rates directed to the infiltration trench were below <br />the 30 gpm threshold, as noted in the attached summary table. Trench performance continues to meet <br />or exceed expectations. The two 121 vadose zone piezometers adjacent to the infiltration trench were <br />monitored per the Technical Revision conditions. Vadose zone water was not detected in the <br />piezometers nor was there evidence of surface water in the vicinity of the trench. Vadose zone <br />piezometer monitoring data is attached with other monitoring data for the trench and adit flows. One <br />water quality sample (12-98 Trench Inlet) was taken during the report period on December 4, 1998. <br />Analytical data are attached. <br />In addition, as part of this monthly report and in accordance with the 9360 Level Adit Closure Monitoring <br />Plan, dated April 1998, Windy Gulch monitoring was continued during this period. One water quality <br />sample 112-98 WGL Weir) was taken on December 4, 1998. Analytical data are attached. Minimal flow <br />was observed due to frozen conditions at the weir at the time of sampling. A visual estimate of less than <br />5 gpm through the existing weir was made at this time. <br />Thank you for your time and attention on this matter. If you have any questions, please contact me in <br />the San Francisco office. <br />Very Truly Yours, <br />~~~/~!~ <br />cc: R. Cellan, Grants <br />F. Martinez, Alamosa BLM <br />Holmer, Colorado WQCD, Denver <br />J. Rowe / S. Randall WMCI, Denver <br />HOMESTAKE MINING COMPANY <br />650 CALIFORNIA STREET • SAN FRANCISCO • CA 94108-3)88 (dt5) 98t-850 <br />