Laserfiche WebLink
PART I <br />Page 25 <br />Permit No. CO-0000221 <br />• E. GENERAL MONTI'ORIIVG, SAMPLIIVG AND REPORTING REQiimRMF'NTS <br />6. Sienatorv and Certification Requirements <br />a. All reports and other information required by the Division, shall be signed and certified for accuracy by We <br />permittee in accord with the following criteria: <br />i. In the case of corporations, by a principal executive officer of at least the level of vice-president or his or her <br />duly authorized representative, if such representative is responsible for the overall operation of the Cacility from <br />which the dischazge described in the form originates; <br />ii. In the case of a partnership, by a genera] partner; <br />iii. In the case of a sole proprietorship, by the proprietor; <br />iv. In [he case of a municipal, state, or other public facility, by either a principal executive officer, ranking elected <br />official, or other duly authorized employce. <br />b. All reports required by permits, and other information requested by the Division shall be signed by a person as <br />described above or by a duly authorized representative of that person. A person is a duly authorized representative <br />only if: , <br />i. The authorization is made in writing by a person described above; <br />ii. The authorization specifies either an individual or a position having responsibility for the overall operation of <br />the regulated facility or activity such as the position of plant manager, operator of a well or a well field, <br />. superintendent, position of equivalent responsibility, or an individual or position having overall responsibility fn- <br />environmental matters far the company. (A duly authorized representative may thus be either a named <br />individual or any individual occupying a rtamed position); and, <br />iii. The written authorization is submitted to the Division. <br />If an authorization as described in this section is no longer accurate because a different individual or position has <br />responsibility for [he overall operation of the facility, a new authorization satisfying the requirements of this section <br />must be submitted to the Division prior to or together with any reports, information, or applications to be signed by <br />an authorized representative. <br />d. The permittee, or the duly authorized representative shall make and sign the following certification on all such <br />documents: <br />"I certify under penaln of law that this document and all attachments were prepared under my direction or <br />supervision in accordance with a system designed to assure that qualified persowel properly gather and evaluate the <br />information submitted. Based on my inquiry of the person or persons who manage the system, or those persons <br />directly responsible for gathering the information, the information submitted is to the best of my knowledge and <br />belief, true, accurate and complete. I am awaze that there are significant penalties for submitting false information, <br />including the possibility of fine and imprisonment for knowing violations." <br /> <br />INDBP 4/9/93 <br />