Laserfiche WebLink
5- <br />The instinctions for preparing Exhibits A-S, Adde~dtmm I, and Geotachnical Stability Exhibit are specified user Rule 6.4 and 6.5 and <br />Rule 1.6.2(I)(b) of the Rules and Regulations. Ifyou have mry questions ce preparing the Exhibits or content otitis information required, or <br />would like to schedule apre-application meeting you may contact the Office at 303-866-3567. <br />ResoonsibiL'Ges as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally binding doamtear. Therefore, dies are a <br />number of important requirements which you, as a pemtittee, should frilly understand. These requrements are listed below. <br />Please readandinitialeachrequire>mat,inthespaceprovided,toacknowledgethatyouunderstandyourobligatio~. Lfyoudonot <br />understand these obligations then please contact this Office for a fall explanation <br />~ ~~~,~ <br />I~~~ <br />~~-~ <br />~-~~ <br />I. Your obligati to reclaim the site is not limited to the amount of the financial warrauty..Yon asstm+P Legal <br />liability for all reasa~nable expenses which the Board err the Office may incuu to reclaim the affected lands associated <br />with your mining operation in the event your permit is revoked and financial warranty is forfeited; <br />2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a Ending that the permittee violated <br />die terms or conditions of this permit, the Act, the Mineral Rtiles and Regulations, or that information coutairied lathe <br />application or your permit misrepteseau irnpcataat material facts; <br />3. If your mining and reclamation operations affect areas beyo®d the baumdaries of as approved permit boundary, <br />substantial civil penalties, to you as permittee can result; <br />4. A~ modification to the approved mining and reclamation plan from those described in your approved <br />application requires you to submit a permit modification and obtain approval from the Board err Office; <br />~~~ 5. Tt 1S yOUr responsibility 1A notify the Office of any changes in your address or phone numbs; <br />`i" ~y~ 6. Upon pemut issuance a~ prior to beginning on-site mining activity, Yw must post a sign at the enhance of the <br />mine site, which shaII be clearly visible from the access road, with the following information (Rule 3.1.12): <br />a the name of the operator, <br />b. a statattcnt that a reclamation pemtit for the operation has been issued by the Colorado Mined Land <br />Reclamation Board; and, <br />c. the permit numbs. <br />rt~"~~ 7. The boundaries of the pemtit boundary area moist be marked by monuments or other markers that are clearly <br />visible and adequate to delineate such boundaries prior to site disturba>ice. <br />8. It is a provision of this permit that the operations will be conducted in accordance with the terms and conditions <br />~~listed inyour application, as well as withthe provisions ofthe Act autdthe ConstiuctionMaterialRules andReawlatiocu <br />in effect at the time the permit is issued. <br />