Laserfiche WebLink
In addition, the design calls fora 2% cross slope and a 1 % longitudinal slope on the top <br />of the pile. Recently placed fill should be graded and compacted to conform to the <br />reclamation plan requirements. The end of the existing underdrain should be located <br />and plans for the construction of the structure to connect it with the extension should be <br />made as per the reclamation plan. <br />Except for the items mentioned above the fill on the waste pile has been constructed as <br />specified in the design approved by the Division of Minerals and Geology. <br />